what are the certifications do we have in testing,i hold
2yrs 4months experience in testing..who are offering,how
much do they cost..whom to contact .plz give me supporting
URLs
Answers were Sorted based on User's Feedback
Answer / s.santhanam
Hi,
For testing professional we have the following
certifications:
1) ISEB (Information system examination Board)
2) ISTQB(Internatinal S/W testing qualification Board)
3) CSTE (Certified S/W test engineer).
First two exams have been conducted by Prometric centres
through online.
Chennai Prometric Centre Address:
----------------------------------
Prometric Testing (P) Ltd,
No.15, 2nd Floor, Romar house,
Jagannathan Road,
Nungambakkam, chennai-34
Ph: 044-282418757
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / vasanthi
Hi there,
I know one certification course on testing called CSTE
(Certified Software Test Engineer). Hope the below link
will help u best.
http://www.softwarecertifications.com/qai_cste.htm
Is This Answer Correct ? | 0 Yes | 0 No |
Hi, Pls tell me what is system use case with a example nd who prepares it.Pls anyone help me.
A man has Ten Horses and nine stables as shown here. [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] The man wants to fit Ten Horses into nine stables. How can he fit Ten horses into nine...
What is Entry and Exit criteria for a Test Plan?
What is emulator?
Faults found should be originally documented by whom?
Your audit indicates that the corporate quality management system did NOT work as it should have. How should this finding be categorized? 1. Minor nonconformance 2. Major nonconformance 3. Deficiency 4. Observation 5. Catastrophic failure
What are the different Metrics followed in the project?
I. Requirements are formally reviewed. II. Requirements are formally approved. III. Requirements are placed under configuration control. IV. Requirements are implemented in code. Using the above statements, when are requirements considered baselined? 1. I and II 2. I, II, and III 3. I, II, III, and IV 4. I only 5. I, III, and IV
What is code review?
'This life cycle model is driven by schedule and budget risks' this statement is best suited for.
What makes an inspection different from other review types?
what r testing tools ,bug tracking tools, test management tools & configuration tools used in ur company?