Hi all,
I use the Requirements Traceability and wnat to send by
email a Trace Comment.
But when I send out the requirement by mail I don’t receive
Trace Comment.
In place of Trace Comment I do receive the other felts who
I didn’t needed
For ex. ReqName, ID, Reviewed, Status, Author, Creation
Date, Creation Time, Modified
But I would rather be with.
ReqName, ID, Trace Comment, RFC_status, Priority, Assigned
To, Author, Creation Date
Above all, I would like to Trace Comments will.
Do you have any idea how to change this? And how to recieve
Trace Comment?
No Answer is Posted For this Question
Be the First to Post Answer
HOw to map testcases with requirements in test lab?
what are diadvantages of Test director/qc?.
Disavantages of document generator? How to take a print out of the steps in the Parameterized scripts?
What is the Extra tab in QC ? (TCS)
After you have completed the first phase of running the 'Test Cases' in TD, now that you have set the status of each step as Pass/Fail. How will you run the same 'Test Cases' for regression testing (say for 2rd or 3th build)?
Can anyone tell me where i can Download free full version of test director
where are test cases stored in Test director?
How do you prepare Bug Reports ? What all do you include in Bug Report ?
3 Answers Brooksource, Derrico,
what are the type of testing and methodologies
How many Reports Can be Got from Test Director?
Use of filters in Test Director?
how to run the qtp scripts in Test director.is it posssiblr or not?? and also i want to see the previes test results,how to see and where to see??