what are the advantages and disadvantages of waterfall model?
Answers were Sorted based on User's Feedback
Answer / fathima
advantages
process is more visible
project can be well managed
better communication among team members
disadvantages
canges cannot be accepted easily
whole system is delivered at the end
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / nnenyelike philip
Advantages of waterfall model:
This model is simple and easy to understand and use.
It is easy to manage due to the rigidity of the model – each phase has specific deliverables and a review process.
In this model phases are processed and completed one at a time. Phases do not overlap.
Waterfall model works well for smaller projects where requirements are very well understood.
Disadvantages of waterfall model:
Once an application is in the testing stage, it is very difficult to go back and change something that was not well-thought out in the concept stage.
No working software is produced until late during the life cycle.
High amounts of risk and uncertainty.
Not a good model for complex and object-oriented projects.
Poor model for long and ongoing projects.
Not suitable for the projects where requirements are at a moderate to high risk of changing.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / narasi
Adv...
Analyzing and managing very easily
Did adv ...
In this middle of the process they are not accept the new requirement and any changes
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / anu
Disadvantages:
It takes more time.
Need more members.
Impratical to apply to small projects.
Unapplicable to forward and backward approach when the
project is small.
| Is This Answer Correct ? | 4 Yes | 5 No |
Answer / swathi madiraju
Advantage:
Waterfall model is less complex
Dis advantage:
Testing should be done at each phase but as testing is done
last,waterfall model fails here
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / rakesh.dalvi
Advantage of Waterfall Model:
-it is very simple.
-easy to execute.
-logical.
Disadvantage of Waterfall Model:
-it is assumes that requirement of system call be frozen
-it is a document driven process that requires formal
document at the end of each phases
-it follows the big bang approach i.e the software that delivered
at one short at the end
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / anuvir
modified model is better than orignal model in water fall
model
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / vanitha
advantages:
1.adding requirements in the version .
2.it is very easy understand
3.it takes less cost
dis advantages
1.time consuming
2.hence man power is wasted
| Is This Answer Correct ? | 2 Yes | 6 No |
Answer / global guy
Advantage:
Less human resources required as once one phase is finished
those people can start working on to the next phase.
| Is This Answer Correct ? | 8 Yes | 13 No |
what is manual testing process
what is test case scenario?
What is buffer overload? How can you test buffer overload in the AUI?
what are the documents that will be created in testing cycle?
What is CVS and why it is used?
What are the phases involved in software testing life cycle?
Can you explain regression testing and confirmation testing?
There are 100 test cases. And you got a bug at 85th test case. You reported it to dev. and dev. fixed that bug. when you are doing regression testing from which test case u'll do testing?? will start from 85 th test case are u'll execute 100 test cases?
what is mean by testing process ?
Write all possible test scenarios for Login screen.
I have planned to take up exam in june. It would be of great help if u can send across some ISTQB material. Kindly mail me at keeran.rr@gmail.com. Thanks in advance.
what type of documents can u prepare during Testing?
5 Answers Covansys, OSF Global Services,