Machines X & Machine Y produces 8000 articles in 4 and 8 hrs
respectively. If they work alternately for one hr each, X
starting first, in what time 10000 articles can be produced?
Answers were Sorted based on User's Feedback
Answer / vishal ingle
Answer is 6.5 Hours
x machine = 2000 articles per hour
y machine = 1000 articles per hour
starting with x machine both machines work for one hour
alternately
10000 articles =
2000(X)+1000(Y)+2000(X)+1000(Y)+2000(X)+1000(Y)+1000(X)
time is 1 (X) + 1 (Y) + 1(X) + 1(Y) + 1(X) + 1 (Y) + 0.5(X)
Answer is 6.5 Hours
Is This Answer Correct ? | 64 Yes | 0 No |
Alok and Bhanu play the following min-max game. Given the expression N=40+X+Y-Z, where X, Y and Z are variables representing single digits (0 to 9), Alok would like to maximize N while Bhanu would like to minimize it. Towards this end, Alok chooses a single digit number and Bhanu substitutes this for a variable of her choice (X, Y or Z). Alok then chooses the next value and Bhanu, the variable to substitute the value. Finally Alok proposes the value for the remaining variable. Assuming both play to their optimal strategies, the value of N at the end of the game would be
7 Answers CTS, Goldman Sachs, TCS,
the sides of a right angle triangle are a & b and the hypoteneous is c.a perpenticular from the vertex divids c in to two segments r & s adjesent respectible to a & b .if a:b=1:3 then what is r:s=?
out of 55 eggs 5 are defective. what is % of defective eggs
I sow her -__ airport At , on , in , across
find the number which is devided by 28 then the reminder will be 24 when devided by 32 reminder will be 4 and when devided by 48 reminder will be 20
1 monkey takes 3 min to eat 1 banana.how much time will 10 monkeys take to eat 10 bananas
27 Answers Caritor, Lionbridge, Microsoft,
what is the difference between sports and games?
f(X)=4f(X-1) THEN VALUE OF X=
A starts from a place at 11.00 am and travels at a speed of 4 kmph , B starts at 1.00 pm and travels with speeds of 1 kmph for 1 hr , 2 kmph for the next hr , 3 kmph for the next hr and so on. At wht time will B catch up with A ?
17 Answers CTS, Infosys, TCS,
Volcano : Lava :: A.) water:swim B.) tunnel:dig C.) crack:wall D.) Fault:earthquate
During a given week A programer spends 1/4 of his time preparing flow chart, 3/8 of his time coding and the rest of the time in debugging the programs. If he works 48 hours during the week , how many hours did he spend debugging the program.
13 Answers L&T, TCS,
9 laboures can complete the construction of a wall in 18 days. How many less days will 12 laboures take to complete the same wall?