Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


You've got someone working for you for seven days and a gold
bar to pay them. The gold bar is segmented into seven
connected pieces. You must give them a piece of gold at the
end of every day. If you are only allowed to make two breaks
in the gold bar, how do you pay your worker?

Answers were Sorted based on User's Feedback



You've got someone working for you for seven days and a gold bar to pay them. The gold bar is ..

Answer / shivaswamy

It as 7pieces
Every day only allowed to make 2 pieces I, e from the full bar remove 1 piece daily and give it to worker keep 6 pieces bar (I, e 1 piece) with you
1234567
Day 1- remove 1
Keep-234567 (I, e 1 piece)
Day 2 -remv 2
Keep 34567(I, e 1 piece)
Day 3- remv 3
Keep 4567(I, e 1 piece)
Day 4- remv 4
Keep 567(I, e 1 piece)
Day 5- remv 5
Keep 67(I, e 1 piece)
Day 6- remv 6
Keep 7(I, e 1 piece)
Day 7- remv 7
0

Is This Answer Correct ?    0 Yes 0 No

You've got someone working for you for seven days and a gold bar to pay them. The gold bar is ..

Answer / cory

well i think its 1.

Is This Answer Correct ?    0 Yes 1 No

You've got someone working for you for seven days and a gold bar to pay them. The gold bar is ..

Answer / spider

I’d say melt the bars

Is This Answer Correct ?    0 Yes 3 No

You've got someone working for you for seven days and a gold bar to pay them. The gold bar is ..

Answer / max

This problem is lacking of important information. It didn't
state that you can exchange the gold piece from the owner
and the worker. It stated only 1 way exchange which from
owner => worker. If someone ask this kind of question in the
interview, he/she must be crazy.

Is This Answer Correct ?    3 Yes 7 No

You've got someone working for you for seven days and a gold bar to pay them. The gold bar is ..

Answer / ben

Geoffrey has the best answer so far in my mind.

Is This Answer Correct ?    1 Yes 8 No

You've got someone working for you for seven days and a gold bar to pay them. The gold bar is ..

Answer / john bevan

Very well.

Is This Answer Correct ?    1 Yes 9 No

You've got someone working for you for seven days and a gold bar to pay them. The gold bar is ..

Answer / manishankar

I dont have an answer for this, but i think the answer given
by Md Abdul Aziz is wrong.
The question clearly states that you have to give them a
piece of gold for every single working day, that means if
the worker is working for 2 days you have to give him 1 gold
piece for each day and not 2 gold pieces at the end of the
2nd day, like what stated in the previous answer.

Correct me if iam wrong.

Is This Answer Correct ?    23 Yes 50 No

You've got someone working for you for seven days and a gold bar to pay them. The gold bar is ..

Answer / greg

The question clearly states that you are only allowed to
make two breaks.. it does not however that the bar is a
rectangle, and the bar is connected by each piece... The bar
is also not said if the pieces are of equal size. You may
make one break in the bar and disconnect 4 of the pieces
that are now not connected at all... another break and your
3 remain our taken care of

Is This Answer Correct ?    1 Yes 28 No

You've got someone working for you for seven days and a gold bar to pay them. The gold bar is ..

Answer / md abdul aziz

divide the bar into 3 parts of 1 unit,2 unit and 4 unit each

if worker works for
1 day - give 1 unit bar
2 days - give 2 unit bar
3 days - give 1 and 2 bars
4 days - give 4 unit bar
5 days - give 4 and 1 bars
6 days - give 4 and 2 bars
7 days - give all three 1,2 and 4

Is This Answer Correct ?    76 Yes 104 No

You've got someone working for you for seven days and a gold bar to pay them. The gold bar is ..

Answer / sanket

another way of doing this would be, say the 7 bars are
numbered from 1 to 7. You need to break 2nd and 7th piece.
This way you will three single pieces (1st, 2nd and 7th)
and one 4 bar piece (3rd,4th,5th and 6th).
Give a single piece on first three days. On fourth give the
4 bar piece and take 3 singles back. Again pay with singles
for 3 days :)

Is This Answer Correct ?    8 Yes 46 No

Post New Answer

More General Aptitude Interview Questions

4_4_4_4 = 20 how ? explain plzzzzzzz. from chemicalengr2008@gmail.com

31 Answers   L&T, Wipro,


One clock rings 7 O'clock in 7 sec.In how many seconds it will ring 10 O'clock.

0 Answers  


There are three trucks A, B, C. A loads 10 kg/min. B loads 13 1/3 kg/min. C unloads 5 kg/min. If three simultaneously works then what is the time taken to load 2.4 tones?

0 Answers   HCL, Infosys,


The Biggest Desert in the world__________

5 Answers  


If A/B = 6/5,then 3A+2B =

0 Answers   3i Infotech,


in a certain group there are two families red and brown;search for mahindra satyam for this paragraph

3 Answers   TCS, UHG,


My flight takes of at 2am from a place at 18N 10E and landed 10 Hrs later at a place with coordinates 36N70W. What is the local time when my plane landed. a) 6:00 am b) 6:40am c)7:40 d)7:00 e)8:00

2 Answers   TCS,


6. x% of y is y% of ? (A) x/y (B) 2y (C) x (D) can't be determined

7 Answers  


first day of 1999 is sunday.what day is the last day?

8 Answers   BNY Mellon, TCS,


what would be the next number in the sequence 8, 20, 28, 44, ?

8 Answers  


hello all,i had applie vizag steel plant enternce exam pattern,any body plse send me my mailid madanmca.2008@gmail.com,

2 Answers   Vizag Steel,


Find the next letter in the series c,o,m,p,u,t,e--

0 Answers   DSQ Software,


Categories