As a Test Analyst, what is the first thing you do when you
receive the Functional Spec for a project?
Answers were Sorted based on User's Feedback
Answer / chandra shekar urukonda
First I review the FRS and Identify the scenarios to be
tested and later pre the testcases as per Identified
scenarios
| Is This Answer Correct ? | 9 Yes | 1 No |
Answer / ml narasimhulu
First i have to study Functional Spec
and after iam going to prepare testcases what modules are
allocated to me
| Is This Answer Correct ? | 9 Yes | 4 No |
Answer / @mit
First of all,v read FRS throughly and discuss it with other
Team Members and Test Lead.
Then start preparing Test scenarios and Test Cases.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / hema
Need to go through the functional specification document and need to understand the scope of the project then start preparing test scenarios.
| Is This Answer Correct ? | 2 Yes | 0 No |
tester can give suggestion to developer "how to fix the bug" in bug report
what is patch,abbrevate SCD,CAPA
1 Answers Ordain Solutions, Verinon Technology Solutions,
Hi...What is Test design and Test data management in Test plan Document?
What are the five dimensions of the Risks?
1.what is the purpose of testing ?
What Defect Density?
What Are the UI Standards?
what is the difference between V model and Waterfall model used in SDLC?
Is a "A fast database retrieval rate" a testable requirement?
our testing team is very very small(how do u initiate the team members
What is the test case, test scenario, test suit and explain differences bewteen the above ones
9 Answers Kclink Technologies, Oracle,
Which methodology u follow in testcase?