On which order testing is done
regression,retesting,functional,User Acceptance
Testing,Usability Testing,Smoke Testing ???
Answer / prabhakar
smoke testing, functional testing, usability testing,
retesting, regression, user acceptance testing.
user acceptance testing is the final gateway of quality,
done after the system testing. system testing which
includes functional, usability, defects retesting followed
by regression.
Is This Answer Correct ? | 20 Yes | 0 No |
I have one doubt in regression testing, Example if we have five modules such as 1,2,3,4,5. If we made change in 3 module only and also 3 module will interact with only 1 and 5 module. For this case we will conduct testing in all module (or) only 1 and 5 module?? Answer soon firends
Principles of testing?
Difference between postponed and deferred bug
which tool used for gui testing?
Do I have to write separate test cases for entering special characters, blank space, numbers in First name field ? Or should I create single test case for it? If yes then how?
What is the different cost elements involved in implementing process in an organization?
What is the major roles & responsibility of a Tester?
Hi, i am looking job in perfomance testing using Loadrunner can any body help me a project in any domine plz(Usah) chs_29@rediffmail.com
anybody having idea about mobile testing materials
What's the difference between Load and Stress testing ?
What is difference between Regression and Restesting?
Suppose you have given less time and you have quite few test cases to run what will your steps to resolve this issue.