Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Thirty men take 20 days to complete a job working 9 hours a
day.How many hour a day should 40 men work to complete the
job? (a) 8 hrs (b) 7 1/2 hrs (c) 7 hrs (d) 9 hrs

Answers were Sorted based on User's Feedback



Thirty men take 20 days to complete a job working 9 hours a day.How many hour a day should 40 men ..

Answer / seema

FOR 30 MEN D NO OF WORKING DAYS=20

FOR 40 MEN D NO OF WORKING DAY=20

MEN =30 40
DAYS =20 20
HRS PER DAY =9 x

30*20*9=40*20*x

so x=6.75hrs

Is This Answer Correct ?    32 Yes 16 No

Thirty men take 20 days to complete a job working 9 hours a day.How many hour a day should 40 men ..

Answer / satish pandey (gbpuat pantnaga

40/30=9/x
x=6.75
correct answer=7

Is This Answer Correct ?    13 Yes 8 No

Thirty men take 20 days to complete a job working 9 hours a day.How many hour a day should 40 men ..

Answer / chithra.g.s

b

Is This Answer Correct ?    6 Yes 4 No

Thirty men take 20 days to complete a job working 9 hours a day.How many hour a day should 40 men ..

Answer / shylu

9 hrs s d correct answer....

for 30 men d no of workin days=20

for 40 men d no of workin days=15

men : 30 40
days : 20 15
hrs per day : 9 x

30*20*9=40*15*x
so x=9hrs

Is This Answer Correct ?    20 Yes 25 No

Thirty men take 20 days to complete a job working 9 hours a day.How many hour a day should 40 men ..

Answer / shruti bhutkar

7hrs

Is This Answer Correct ?    4 Yes 9 No

Post New Answer

More General Aptitude Interview Questions

There are two sorted arrays a1 and a2 of size n1 and size n2 respectively. array a1 is full array a2 has exactly n1(size of array a1) empty space. example a1[]=1234 a2[]=56789_ _ _ _ Write a function to merge these two arrays to form a sorted array without any extra memory use. i want a solution in c/c++ language

2 Answers   Nagarro,


There are 9 balls of these one is defective. Find the minimum no. of chances of finding the defective one.

0 Answers   Accenture,


A solid cube of each side 8cms, has been painted red , blue , black on pairs of opposite faces.It is then cut into cubical blocks of each side 2cms.

1 Answers   CTS,


4 pipes inlet and 2 pipes outlets, find water inlet etc.

0 Answers   3D PLM,


Find the next series: BC CE EG GK ?

0 Answers   CTS,


There are 9 coins. Out of which one is odd one i.e weight is less or more. How many iterations of weighing are required to find odd coin?

6 Answers   Morgan Stanley,


distance D=rt where r & t are +ve and r is constant,as t increses then D_________

2 Answers   Wipro,


40.83 x 1.02 x 1.2 = ? (a) 49.97592 (b) 41.64660 (c) 58.7952 (d) 42.479532 (e) None of these

3 Answers  


How many digits will be there to the right of the decimal point in the product of 95.75 and .02554 ?

0 Answers  


In a class photograph, 5 girls are sitting in the front where as 20 boys are standing behind them. The corner two positions are reserved for the tallest boys of the class. What are the number of ways the students may be arranged?

0 Answers   CGI,


what is the fullform of yes bank?

2 Answers   LaLT Hotels, Yes Bank,


A is driving on a highway when the police fines him for overspeeding and exceeding the limit by 10 km/hr. At the same time B is fined for overspeeding by twice the amount by which A exceeded the limit. If he was driving at 35 km/hr what is the speed limit for the road?

1 Answers   Accenture,


Categories