what is suspension criteria and exit criterai in test
plan/????
Answers were Sorted based on User's Feedback
hai....
Suspension/Resumption Criteria in a Software Test Plan :
If any defects are found which seriously impact the test
progress the test lead may choose to supend testing.
The criteria which are considered for suspension or
resumption are :
[a] hardware / software not available at the time indicated
in the project schedule
[b] the build contians many serious defects which seriously
prevent or limit testing progress
[c] Assigned test resources are not available when needed
by the test team
Resumption Criteria :
If testing is suspended, resumption will only occur when
the problem(s) that caused the suspension have been
resolved. When a critical defect is the cause of the
suspension, the “FIX” must be verified by the testing team
before testing is resumed
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / n@n!
temporary stoping of testing due to problems in either
Haraware/Software/Human Resourse....
totally comming out of the application is called exit
criteria
| Is This Answer Correct ? | 4 Yes | 1 No |
Suspension criteria specify the criteria to be used to suspend
all or portion of testing activities. And Resumption criteria
specify when a testing activity can be resumed after it has
been suspended.
Exit criteria specify the criteria to be used to stop the
testing activities.
| Is This Answer Correct ? | 2 Yes | 3 No |
what is fs
what is smoke testing?
What is inter-operability?
If anyone have attended interview with deloitte for the post of senior manual test engineer. Please share the interview process and the questions asked. How to prepare for the interview. Thanks in advance
How to give introduction for Manual Testing interview?? say when you show you have 4 years of experience in Manual Testing.
What type of testing you perform in organization while you do system testing, give clearly?
Write down ten test cases for below scenario: Increase the day by 1 and date format should be mm/dd/yyyy Conditions are : date should not be greater then 31 and date<1 month should not be greater then 12 and month<1 year should not be greater then 10000 and year<1 Thanks in advance
on what basis do the tester asssign severity
How will u write test cases based on EQA(Equivalance class partitioning) & BVA(Boundary value analysis.?Plz explain in brief?
Please give an example of White box Testing?
in case of web application what kind of areas we r tested and one more in case of database testing what we are testing tell me in brief.
4. A software error can be described as: a. A description of the relationship between two or more variables or set members in which the value of one does not influence the values of others. b. Any ill-advised, substandard, or temporary fix applied to an urgent problem in the (often misguided) belief that doing so will keep a project moving forward. c. The process in which developers determine the root cause of a bug and identify possible fixes. d. A mismatch between the program and its specification. 5. Select a reason that does not agree with the fact that complete testing is impossible: a. The domain of possible inputs is too large to test. b. Limited financial resources. c. There are too many possible paths through the program to test. d. The user interface issues (and thus the design issues) are too complex to completely test.