what is srs or brs file
Answers were Sorted based on User's Feedback
Answer / sachin
By using BRS (business requirement specification).. we can
prepare use cases... we can get initial idea of
system/software which we are going to develop.. BRS
contains some initial requirements which we get from client.
By BRS.. we prepare SRS.. IN SRS, whatever requirement we
got in BRS.. we put in a well documented format with some
additional domain or system knowledge. Usually Business
analyst person prepare SRS. BAs also provides some
enchantment or modification to the BRS requirements.
Tester/developer mostly interact with the SRS (not BRs)..
If we consider SDLC thn BRS comes first then SRS comes
SDLc( in brief form)
1) BRS
2) SRS
3) Design
4) Coding
5) Testing
6) Support/maintenance
Thanks
Sachin
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / satyanarayana
-> BRS means (Bussiness Requirement Specification)
in this the high authority people,bussiness people
involve in this procress.
There are discussing about
Timings,Costing,Aggrement,e.t.c all are kept in one
document.
-> SRS means (Systen Requirement Specification)
In this mainly we have
1.User Interface Specifications (Cosmetic
Feature,Usability,e.t.c)
2.Functional
3.Non Functional
4.Environment Specification
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / ram
SRS is nothing but Requirement Document. It discribes total Requirements clearly. ex: Functionality, software n hardware.
| Is This Answer Correct ? | 1 Yes | 0 No |
BRS - Businees requirement specification,
SRS - Software ,, ,,
Always client send the BRS to BA (Business analyst) and he
convert the BRS into SRS. since BRS is fully written on
businees language that's why we have BA to convert the BRS
to SRS. Based upon SRS only developers develop the product
& testers understannd the product then start write the test
cases.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / satish
Srs Means software requirement specification document,It
will helps to write test cases, as well as brs means
business requirement document it will also helps to prepare
good test cases
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / chabs
al the above answers r rite...
to be more specific, BA's convert business language(BRS) to
software language(SRS) so that developers can understand it
better
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / aravind
srs-->s/w requirement document(it can seen in the analysis)
brs-->business req document(it can be seen in initial level &
it is creaTED BY BUSINESS ANALIST)
| Is This Answer Correct ? | 0 Yes | 0 No |
what is entry and exit criteria?
how testing is carried out in real time agile methodology i mean to say how a job is assigned to one tester in a team
what are the reason for assigning the status Postponed and differed to a bug? Pls tell me with exampless
After project was released to customer the customer find a defect in u r build. the build is related to that area which u had tested that. so u r TL comes and asks u then how will u convince u r TL and The customer
What is the exact difference between smoke testing and sanity testing.?
Diffrent between Smoke and Sanity tesing?
combo box is object or picture?
What is frame level testing and how do we test it?
Explain prototype model?
If we have no SRS,BRS but we have test cases does u execute the test cases blindly or do u follow any other process|
What is deferred status in defect life cycle?
Apart from integrating testing,what a test engineer will do in system testing?