ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.15 : Based on Time Discounting of Money, let y = x / (1 + r) ^ n, where ^ = power, r = interest rate for the period in decimal value, n = number of periods, y = current value, x = future value. According to Present Value Addition Rule, the present value of a set of future payments is equal to sum for present value of each of the payments. In an engineering business, 3 future payments are to be made : $100 after 1 year; $500 after 2 years; $200 after 3 years. (a) Form an equation of y as a function of r. (b) Find the value of y in 5 decimal places if r = 8 %.

1 1229

ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.16 : An engineer would like to invest his money in a home, business and bond. The implicit interest payment frequency is monthly for home loans, quarterly for business loans; semi annually for bonds. A generalized mathematical formula to calculate I = interest rate equivalence is I = (1 + i / N) ^ N - 1 where i = annual interest rate, N = number of payment per year. (a) Calculate the value of N for : (i) home loans; (ii) business loans; (iii) bonds. (b) For i = 0.08, find the value of I for : (i) home loans; (ii) business loans; (iii) bonds.

1 1427

ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.17 : In the engineering calculations of interest rate caused by inflation, General Inflation Effect and Fisher Effect may be considered. Let I = inflation rate, R = nominal interest rate, r = real interest rate. According to Fisher Effect, (1 + R) = (1 + r) (1 + I). According to General Inflation Effect, r = R - I. (a) If I = 0.1 for all effects, both the values of R and r in the Fisher Effect are the same as R and r in the General Inflation Effect, find the values of R and r. (b) If R has the same value caused by both General Inflation Effect and Fisher Effect, find the possible values of R, r and I in term of R etc.

1 1284

If flow rate of natural gas mixture in sweating gas unite is 460000 m3/day Can it be converted into mole/day?

Shell,

1 1313

ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.18 : An investor is planning to purchase a small office for biochemical engineering consultancy on loan. In the calculation of the discount of payment in arrears, the following formula is used : y = 1 / (1 + r) ^ 1 + 1 / (1 + r) ^ 2 + 1 / (1 + r) ^ 3 + ... + 1 / (1 + r) ^ n where y = present value, r = interest rate of discount, n = number of payment, ^ = power used in certain computer languages for mathematics. (a) What is the meaning of : arrears? (b) Find a mathematical equation of y (1 + r). (c) Calculate, in less than 3 terms, y as a function of r and n.

1 1292

ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.19 : In the purchase of a unit of engineering office, a loan has been made to a bank with the following details : Term N = 30 years; interest rate R = 8.07 % / year; security : primary residence; present value pv = $450000; salary = $75000 / year or $56000 / year after tax. (a) Let the discounted present value PV = [ 1 - 1 / (1 + r) ^ n ] / r for arrears, where r = interest rate of discount, n = number of payment, ^ = symbol for power. If the loan repayment was made monthly : (i) calculate the value of r where r = R / k and R is in decimal value; (ii) find the value of n where n = kN; (iii) estimate the value of k where k = number of repayment per year; (iv) calculate the value of PV based on the formula of discounted present value. (b) Calculate the monthly repayment of the loan, MR based on the following formula : pv = PV x MR. (c) Find the percentage of salary remains after paying the loan every month.

1 1444

ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.20 : Assume an engineer buys a $1 bond in period T while the nominal interest rate is R. The inflation rate at T + 1 is anticipated to be I. (a) If the bond is redeemed in period T + 1, how much money will the buyer engineer receive, in term of R, which is not affected by inflation? (b) Find the present value, PV of the proceeds from the bond, in term of R and I. (c) If the bond is redeemed in period T + 1, calculate the real growth or real value of the money that the buyer engineer will receive, in term of r = real interest rate, which is affected by inflation. (d) From the answers in (b) and (c), find the values of x, y and z in the following Fisher equation : (1 + x) = (1 + y) / (1 + z), in term of r, R and I.

1 1257

ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.21 : The cost of building a biochemical processing plant is increasing due to inflation. Let I = inflation rate, R = nominal interest rate, r = real interest rate. According to Fisher Equation, (1 + r)(1 + I) = (1 + R). According to General Inflation Equation, R = r + I. (a) By assuming that both r and I are fairly small, prove by mathematical calculations that complicated Fisher Equation could be simplified into the General Inflation Equation. (b) By using 2 first order Taylor expansions in the linear approximation, namely 1 / (1 + x) ≈ (1 - x), (1 + x)(1 + y) ≈ 1 + x + y, show by mathematical calculations that (1 + r) = (1 + R) / (1 + I) could be approximated by r ≈ R - I.

1 1293

ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.22 : An engineering company intends to produce a small piece of biochemical instrument for sales. Let A = overall fixed cost of production, B = variable cost of production per unit, C = selling price per unit, D = quantity of unit produced. Breakeven Analysis is used where revenue = cost. (a) Explain the role of Breakeven Analysis by using A, B, C and D. (b) Find the value of Contribution Margin in term of A, B, C and / or D. (c) At the breakeven point where revenue = cost, derive an equation of D as a function of A, B and C.

1 1272

ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.23 : An engineering company would like to produce 10000 units of control instruments. Let selling price per unit = $10, variable cost per unit = $2, overall fixed cost = $30000. (a) Calculate the income obtained when all units are sold out successfully. (b) Find the overall cost of production. (c) Calculate the percentage of gross profit obtained based on the answers in (a) and (b). (d) Find the minimum units that need to be sold out successfully in order to prevent losses. (e) How many minimum units of instruments that need to be produced in order to prevent losses, if all units produced are sold out successfully?

1 1295

ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.24 : (a) The net present value of an engineering project is given by V. Let Q = summation of [ T / (1 + I) ^ N ] from N = A to N = B, where P = project cost, T = tax inflow, N = duration. If V = P + Q where P = -$1000, T = $275, I = 0.12 (means 12 % , capital cost of project per year), A = 1 year, B = 5 years, calculate the value of V. (b) The present value tax shields are W = $ (11.9725, 9.1486, 6.5579, 4.1811, 2.0005) in 5 beginning balances of an engineering project. Find the adjusted present value of the engineering project X, when X = V + (summation of the values of W).

1 1363

ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.25 : (a) If an engineering company has a policy to maintain A % debt ratio, it will limit its total debt B, to A % of all company assets with total assets C. Find the value of A as a function of B and C. (b) An engineering consultancy that designs biochemical processing plants has a beginning balance in a bank of value D. The interest paid by the bank to the consultancy for the saving is E. The consultancy withdraws F amount of money from the bank to cover the project cost. (i) Calculate the end balance in a bank of the consultancy by using the symbols of D, E and F etc. (ii) Find the value of the principal due to E and F.

1 1123

ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.26 : In a construction accounting for a biochemical processing plant, $A has been spent to date, and another $B is expected required to complete the construction project. The biochemical processing plant is expected to generate a total revenue of $C. Calculate the : (a) estimated total costs; (b) percentage completion of project; (c) total estimated profit; (d) profit to date.

1 1235

ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.27 : A biochemical engineering consultancy applies construction accounting in its finance. Its project began on 1 January 2010. Total revenue generated from the project was $9000. On 1 January 2011 as the budget, $2000 had been spent, with $6000 expected. However, the project cost increased latter, causing deviation from its initial budget on 1 January 2012, where $7000 had been spent, with $1400 expected. Let (estimated total cost) = (spent cost) + (expected cost to be spent), (percentage completion) = 100 (spent cost) / (estimated total costs), (total expected profits) = (total revenue) - (estimated total costs). Calculate : (a) total expected profits on 1 January 2011 and 1 January 2012; (b) estimated total cost as and not as the budget; (c) percentage completion of the project since the project began, in the first and second years.

1 1162

ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.28 : In the development of a small engineering facility for biochemical processing, completed contract method is applied in its construction accounting. In a short contract period, let the (contract price) = A. Let the (costs to date) = B; (estimated cost to complete) = C. (a) Find the values of : (i) estimated total costs; (ii) total estimated profit; (iii) percent completion to date. (b) If the project contract is 100 % completed : (i) find the total gross profit recognized; (ii) what is the exact numerical value of C?

1 1294


Post New Chemical Engineering Questions

Un-Answered Questions { Chemical Engineering }

What types of valves are recommended for slurry services?

619


What is the difference between horizontal and vertical heat exchanger?

743


What does the catalytic converter on an automobile really do?

572


What are the types of load?

675


What are the different types of equipments for the conveyance of solids?

549






Explain under what circumstances are vortex flowmeters the most accurate?

547


Explain what are the disadvantages of using gear pumps?

598


How can you quickly estimate the horsepower of a pump?

650


What are the apt definitions for apparent power, active power and reactive power? Explain about different types of lamps?

602


What are the problems that are associated with the expansion joints?

631


What are some common problems associated with dilute phase pneumatic conveying?

639


Are you having any experience in antibody designing?

2012


Name some common problems associated with dense phase pneumatic conveying?

611


Define an additive?

547


When an expansion is joint needed on the shell side of a shell and tube heat exchanger?

611