Prepare a Schedule for a Highrised building from starting stage to Handover?

bscpl,

525

VAT and CST ? Which benefits for buyer ? Why benefits?

L&T,

589

What is bending movement formula define

L&T,

1 950




at which depth the construction of tunnel is economical from cost and engineering aspect.

535

Curing time for 1)R.C.C slab 2)B.W 3)Plastering

PCC,

558

what are the five benefits of using standard terminology in the measurement process?

673

Let suppose A building wall is 12 ft high and 30 ft long and labour cost is 100 rupee per feet so calculate the total cost of labour and also explain in detail...plz ans me immadiately i am hurry Thanx

1 411

A building wall is to be constructed , its 12 ft high and 40 ft long and labour cost per foot is 100 rupees , tell me the total cost of labour for that building work plz explain answer ..I am hurry plz any one give me ans as immediately as possible Thanx

1 534




Our IDCT industrial cooling tower height is 15 mtres so need to RCC structure stability test as par any IS Standard or Indian act.

Sepco,

1 467

How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy

Ashtech,

450

1 cft concrete equal how many kgs

1 683

Floor tile measurement? Wall to wall or skirting to skirting

477

How much cement,sand,bricks and water needed for 1square metre brick work?

491

which type of binding wire gauge using gulf countries

Al Rashed,

2 686

In T beam design, which are the regions selected as rectangular and Flanged ?

338


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

what is the difference between prime coat and tack coat in road construction

3180


GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.

1047


pls mail some more tecnical qustions at msaranya2610@gmail.com

789


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

1808


What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.

3108






Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

1022


beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?

818


procedure for preliminary selection of size of column of 5 storey building

1555


what is called the inverd level of mabhole chamber?

512


What is the cost difference between site mix and ready mix concrete per cubic meter

661


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

516


what is stressing

4620


can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density

738


How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete

434


when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?

966