Let suppose A building wall is 12 ft high and 30 ft long and labour cost is 100 rupee per feet so calculate the total cost of labour and also explain in detail...plz ans me immadiately i am hurry Thanx
1 2275A building wall is to be constructed , its 12 ft high and 40 ft long and labour cost per foot is 100 rupees , tell me the total cost of labour for that building work plz explain answer ..I am hurry plz any one give me ans as immediately as possible Thanx
1 2556Our IDCT industrial cooling tower height is 15 mtres so need to RCC structure stability test as par any IS Standard or Indian act.
1 2261Post New Civil Engineering Questions
what are the values of compressieve strenght?
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
Define What is passive earth pressure ?
Explain the importance of moment of inertia?
what is high type road and low type roads
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
What is the usage of zoom command?
Which prize is the alternative to the NOVEL Prize?
Why was the empire state building made of steel?
Describe Briefly The Various Methods Of Concrete Curing?
For what purpose bedding is used under storm water drains?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.