how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
1196Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
1339Write down a formula to calculate the number of 50Kg bags of cement for moulding of cement blocks of tcm thick by 20cm high by 40cm long on site with a mix ratio of 1 bag of cement to 3 wheelbarrows of sand . the sand is measured at a STRUCK( WATER LEVEL) 65 litres capacity wheelbarrow. TEL: +237 674630019
1 1746Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
1140Post New Civil Engineering Questions
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What are the advantages and disadvantages of lead products in construction?
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
Spider cracks occur in beam bottom due to––
How many litres of water used for curing of 1000sqft of slav
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
at what pressure ply-wood is obtained by gluing wooden sheets
Why should appointment store person for project ? what is the benefits for company ?
Why are the bolts that hold steel rails together in oval holes?
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
for pretensioning which will yield first and same for post tensioning?
it is a corrected question." make a list of engineering property(properties) of soil.