Project at andheri west mumbai total area of 116000 sq ft near by..Please help me out for quotation plan is ready basic details are with me , please help me out .I will mail u in autocad also.
1 1780while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
XYZ,
1193for basic costing, how can we calculate how much amount of steel and cocrete will go in per sqft? and what are the thumbrules?
1 2059Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
1979Two way slab, curtailment provided in both side in longside and short side. which side curtailment provided in one way slab?
IBA,
1 2432why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
C&W,
1181How many bags of cement will be required for 45.5 M^3 Concrete with the ratio of 1 Cement+1 Crash+ 2 Sand+1 Gravel?
1320Post New Civil Engineering Questions
How do you maintain water pressure?
what r you reqired for concrete baching plant?
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
how can we calculate steel value, depending on load
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
What are the phases inspections are done by local authority while construction?
Is there the dry coefficient of cement is constant?
What is braced excavation all about?
what is the meaning of degreasing of the euipment or line.
How many square meter can a worker/labor demolish a structure per day?
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
how much need sand and cement for 1 cft roof construction?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
what is the design procedure for building