how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
1319For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
UPSSSC Uttar Pradesh Subordinate Services Selection Commission,
1021Tell the least count of a prismatic compass , surveyor compass , Theodolite & how we can determine it ?
2 527910'0" × 10'0" Proposed room Start and Finish How many Cement & Sand & Bricks & Metals & Steels Need
1 1473Post New Civil Engineering Questions
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
Does brick grows bigger every year?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
how to compute slab reinforcements on step by step procedures??
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
what is the 0 value in quantity surveying
pile load testing procedure
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
What is the tensile strength of wood?
how to calculate the scour depth
What is missing report and how to prepare
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal