what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
1862Post New Civil Engineering Questions
Why we provide hair pin for shed
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
what is right & short method of measurement of slab&beam
Explain the difference between shear and tensile strength.
What is zoning permit?
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
Aptitude, reasoning, quants, verbal and technical question
what is diffrence between catchment area,watershed and basin?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
Why are steel plates inserted inside bearings in elastomeric bearings?
Water filter calculation formula
what is a well