How do we get this formula Ast=(0.5Fck/Fy) into(1-(in sqrt(1-((4.6Mu)/Fck.bd^2))into bd Fck=grade of cement i.e M25, M20 Fy=grade of steel i.e.Fe415,Fe250 Mu=moment b=width d=depth
1 16189How to calculate the material for pile 450 mm dia & 300 mm dia with formula find Cement = ? Sand = ? Blue metal = ?
Suda,
1 507032mm bar column lapping we use welding binding what is dimension of welding as per stander code?
RMC,
2 4173how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
33021 cft of brickwork 1:6 mortar ratio need 12 numbers of bricks so find the quantity of sand and number of cement bags
2 10302Post New Civil Engineering Questions
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
what is the meaning of 40/20 src
What are the different softwares used for cad?
In cement concrete how to check a quality of material also proportion of material at site ?
What you understand by building codes?
what is the list of building construction equipment & teir output?
how to compute slab reinforcements on step by step procedures??
Explain the design for rcc multi-storied building?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
What is Joule Brayton Cycle?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
How do you measure concrete?
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.