You have casted a column above your footing, and you found out it is off its location by 5cm. What would you Do?
5 9938hello; sir. i would like to be an assistant executive engineer in irrigation department. is it really necessary to take coaching? or can i prepare myself by studying any study materials available in market? if so; what are the books i have to purchase. please reply soon.
NCC,
2574how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
2655how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
2825Post New Civil Engineering Questions
what is civil engineer greatest strength and weakness?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
cement and sand required for one block of size 0.23*0.15*0.46
What is made from large rocks, which protects the base of cliffs?
why we use 19x9x9and 20x10x10 but not other
What do you understand by “preset” during the installation process of bridge bearings?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
what are the Task work of different labour.?
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
How can I make justification between using concrete grade c35 compare c37?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
how to do sudoko puzaals?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.