minor loss due to sudden contraction 1>flow contraction 2>Expanssion of flow after sudden contraction 3>cavitation 4>boundry friction

1 1512

the bubble tube parallel to the telescope of theodolite should be more sensitive since it controls a. vertical axis b. horizontal axis c. axis of bubble tube d. none of this

3 4672

if dia of capillary tube is doubled the capillary rise will unaffected doubled halved none

1 1850




nitrates more than 45 mg/l in water lead to disease called gastroenterities motteled teeth polio none

1 2637

cross hairs in surveying telescope are fitted in the objective lense at the center of the telescope at the optical centre of eyepiece in front of the eyepiece

2 3561

shearing strength of cohesionless soil depends upon dry density rate of loading confining pressure all above

1 3069

undisturb samples are obtained by direct excavation thin walled sampler thick walled sampler none of this

1 1679

relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2

SSC,

948




in plate load test what is the thickness of plate 20mm 5mm 50mm none

825

the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C

826

the diff bet face left & face right observation of theodolite is 3' the error is 45'' 1'30'' 3' 0'

1 3198

quick sand is a type of sand flow condition occuring in cohesive soil flow condition occuring in cohessionless soil all above

1 1828

Bernaullis theorem deals with the law of conservation of mass momentum energy none

735

primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above

754

in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

752


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

How can i do RCC rate analysis?

442


what is the use of water bar in water tank and is this an extra item in estimate?

1164


I need old MMUP exam question and answer for Civil engineering

191


roll of DLC in road constructions

595


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

1225






by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)

800


what is the depth of a pile foundation??density of wood?? nominal mix ratios for different grades of concrete? effect of earthquake on structures? bending moment and shear force diagrams and also learn to find out the deflection..how is under water concreting done??

2428


we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level

1083


What are your goals?

848


what is the maximum number of course that can be laid according to IS code and the max height.

742


Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)

583


Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)

3699


what is the types of door's wood?

741


density of crush sand & crush stone or grit powder

4097


how to calibrate the RM 800

711