CISA Certification Interview Questions
Questions Answers Views Company eMail

A MAJOR risk of using single sign-on (SSO) is that it: A. has a single authentication point. B. represents a single point of failure. C. causes an administrative bottleneck. D. leads to a lockout of valid users.

1 9196

In an online transaction processing system, data integrity is maintained by ensuring that a transaction is either completed in its entirety or not at all. This principle of data integrity is known as: A. isolation. B. consistency. C. atomicity. D. durability.

2 8746

Applying a digital signature to data traveling in a network provides: A. confidentiality and integrity. B. security and nonrepudiation. C. integrity and nonrepudiation. D. confidentiality and nonrepudiation.

2 8349

Failure to adequately define or manage the requirements for a system can result in a number of risks. The GREATEST risk is: A. inadequate user involvement. B. inadequate allocation of resources. C. scope creep. D. an incorrect estimation of the critical path.

1 3991

In the development of an important application affecting the entire organization, which of the following would be the MOST appropriate project sponsor? A. The information systems manager B. A member of executive management C. An independent management consultant D. The manager of the key user department

1 3288

Which of the following group/individuals should assume overall direction and responsibility for costs and timetables of system development projects? A. User management B. Project steering committee C. Senior management D. Systems development management

1 5046

A primary reason for an IS auditor's involvement in the development of a new application system is to ensure that: A. adequate controls are built into the system. B. user requirements are satisfied by the system. C. sufficient hardware is available to process the system. D. data are being developed for pre-implementation testing of the system.

1 4281

Which of the following is LEAST likely to be contained in a digital certificate for the purposes of verification by a trusted third party (TTP)/certification authority (CA)? A. Name of the TTP/CA B. Public key of the sender C. Name of the public key holder D. Time period for which the key is valid

1 3978

Which of the following is critical to the selection and acquisition of the correct operating system software? A. Competitive bids B. User department approval C. Hardware-configuration analysis D. Purchasing department approval

1 12775

The purpose of debugging programs is to: A. generate random data that can be used to test programs before implementing them. B. protect valid changes from being overwritten by other changes during programming. C. define the program development and maintenance costs to be include in the feasibility study. D. ensure that abnormal terminations and coding flaws are detected and corrected.

1 3427

Which of the following is the primary purpose for conducting parallel testing? A. To determine if the system is cost-effective. B. To enable comprehensive unit and system testing. C. To highlight errors in the program interfaces with files. D. To ensure the new system meets user requirements.

1 15872

The quality assurance group is typically responsible for: A. ensuring that the output received from system processing is complete. B. monitoring the execution of computer processing tasks. C. ensuring that programs and program changes and documentation adhere to established standards. D. designing procedures to protect data against accidental disclosure, modification or destruction.

Nest,

1 7223

The PKI element that manages the certificate life cycle, including certificate directory maintenance and certificate revocation list (CRL) maintenance and publication is the: A. certificate authority. B. digital certificate. C. certification practice statement. D. registration authority.

2 7408

Which of the following has the LEAST effect on controlling physical access? A. Access to the work area is restricted through a swipe card. B. All physical assets have an identification tag and are properly recorded. C. Access to the premises is restricted and all visitors authorized for entry. D. Visitors are issued a pass and escorted in and out by a concerned employee.

1 4228

An IS auditor should be concerned when a telecommunication analyst: A. monitors systems performance and tracks problems resulting from program changes. B. reviews network load requirements in terms of current and future transaction volumes. C. assesses the impact of the network load on terminal response times and network data transfer rates. D. recommends network balancing procedures and improvements.

1 6220


Post New CISA Certification Questions

Un-Answered Questions { CISA Certification }

WHICH OF THE FOLLOWING IS OFTEN AN ADVANTAGE OF USING PROTOTYPING GOR DYDTEM DVELOPMENT

2826


purchase orders issued to vendors have been authorized as per the authorization matrix

1080