IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
2275how costing is done in pp or how u will know the cost of a product which is manufactured in ur plant
4 16263Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
4779If I need to maintain a PP module in SAP from the information received from another system, Can i use a table to create the data required for creating the PP
1 5208What are SAP Configuration Steps along with Tcode and Master data for New Product Development and Introduction? Please give step by step answer along with T code for each step and master data and Org. element required for each step. Thanks in advance.
2 17626Post New SAP PP (Production Planning) Questions
Explain how can you create production order without routing and bom?
Difference between standard cost and variable cost.
Explain Kanban.
What is the use of t-code cs20 in bom?
What is golive actually? What is the role of a functional consultant in golive actually?
What are the t-codes for creating, changing and summarizing bom?
In lsmw which is the most important step?
What is sla (service level agreements)?
What are the reports generated in product cost controlling information system?
Define 'sop' (sales & operations planning)?
Explain DMR.
In project the customization is comes under which phase?
What is Individual and collective requirements and differecne between them in MTO scenario?
How does sap know that an operation has components as indicated by the component allocation indicator?
What is Planning time Fence?