Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

COBOL Interview Questions
Questions Answers Views Company eMail

consider the following two statements MOVE 10 TO N PERFORM PARA-X N TIMES STOP RUN PARA-X MOVE 5 TO N how many times PARA-X willbe exicuted? a.10 b.5 c.infinate d.execution error

ABCL, TCS,

6 14182

given the following: 77 A PIC 9V9 VALUE 9.5 77 B PIC 9 VALUE 9. 77 C PIC V9 VALUE 0.8 77 D PIC 9 77 E PIC 9 77 F PIC 9V999 what are the contenta of D E nad F after the following statements are executed: COMPUTE F ROUNDED=A+C/B MULTIPLY A BY C GIVING E ADD B C A GIVING D ROUNDED a.F=9.589 E=8 D=1 b.F=9.589 E=8 D=9 c.F=9.589 E=7 D=9 d.F=9.589 E=7 D=1

Broadridge, TCS,

5 14435

A LESS 1200 IF B GREATER 25 MOVE 47 TOC ELSE MOVE 57 TO C IF A GREATER 249 MOVE 67 TO C ELSE NEXT SENTENCE ELSE IF B LESS 67 MOVE 27 TO C What will be the value of C, when A is 137 and b is 25

TCS,

3 6645

Consider the following: 77 W-NUM PIC 9 VALUE 0 ------ MOVE 1 TO W-NUM PERFORM PARA-X UNTIL W-NUM > 9. ------ PARA-X ADD 1 TO W-NUM How many times PARA-X is executed ?

Accenture, TCS,

14 24455

Consider the following code: 77 A PIC 99V99 VALUE 55.35 77 B PIC 99V999 VALUE 32.754 ADD B TO A ON SIZE ERROR DISPLAY "ERROR!!!" What will be the result ? (a) A=88.10, B=32.754 (b) A=87.00 B=32.754 (c) A=87.10 B=32.754 (d) ERROR!!! will be DISPLAYed on the screen.

TCS,

3 12468

Consider the following: 77 A PIC 9(10) 77 B PIC 9(10) 77 C PIC 9(19) MULTIPLY AB BY B GIVING C Which of the following is true ? (a) The execution of the above may result in size error. (b) The execution of the above will result in size error. (c) The definition of C is invalid resulting in compilation error. (d) No error will be thee and the program would proceed correctly.

TCS,

4 8864

A paragraph PARA-X is to be executed when none of the data names A, B and C have value of 1. Which of the following will achieve this ? (a) IF A NOT = 1 OR B NOT = 1 OR C NOT = 1 PERFORM PARA-X (B) IF NOT A= 1 AND B= 1 AND C = 1 PERFORM PARA-X (C) IF A NOT =1 IF NOT B = 1 OR C= 1 PERFORM PARA-X (C) IF A NOT = 1 AND B NOT = 1 AND C NOT = 1 PERFORM PARA-X

TCS,

3 7163

Identify the invalid dataname from the following: (A) savings-account (B) annual-allocation-for-overhead (C) samount250 (D) 12demand

TCS,

4 7790

Study the DATA DIVISION entries and the three PROCEDURE DIVISION entries given below: 01 END-OF-FILE-SWITCH PIC XXX. 88 NO-MORE-RECS VALUE "YES". 88 MORE-RECS VALUE "NO". (i) READ SAMPLE-FILE AT END MOVE "YES" TO NO-MORE-RECS. (ii) IF NO-MORE-RECS = "YES" GO TO LAST-PARA. (iii) IF NO-MORE-RECS GO TO LAST-PARA. Which are wrong? (a) (i) and (ii) (b) (ii) and (iii) (c) (i) and (iii) (d) all

TCS,

5 8595

The following entries appear in the WORKING-STORAGE SECTION: 01 DATE-TODAY. 05 YY PIC XX VALUE "90". 05 MM PIC XX VALUE "12". 05 DD PIC XX VALUE :31". 01 DATE-EDIT PIC XX/XX/XX. MOVE DATE-TODAY TO DATE-EDIT. (a) 901231 (b) 90/12/31 (c) 31/12/90 (d) 311290

TCS,

4 8709

How many bytes will be allocated for the following record description entries? 01 REC-A. 05 A PIC S9(4). 05 B PIC XXXBXXX. 05 C PIC ____9.99. 05 D PIC S9(5) COMP-3. 05 E PIC 9(3) COMP.

IBM, TCS,

16 26022

What is wrong with the following data declaration? 01 W-DATE PIC X(6). 05 DD PIC 99. 05 MM PIC 99. 05 YY PIC 99. (a) Nothing is wrong. (b) Under W-DATE all level 05 items are having a PIC 99 but level 01 has PIC X(6). (c) PIC can't be specified for a group item. (d) DD, MM, and YY are invalid datanames.

Mphasis, TCS,

6 13703

What is the output generated by the following code? 01 GRP-I. 05 SUBFLD1 PIC XX VALUE "AB". 05 FILTER PIC X(6) VALUE SPACES. 01 GRP-2 REDEFINED GRP-1. 05 SUB-FLD2 PIC XX. 05 SUB-FLD3 PIC XX. 05 FILTER PIC X(4). IF SUB-FLD1 NOT = SPACES DISPLAY "SUBFLD1" MOVE "ABBCCD" TO GRP-1 IF SUB-FLD3 = SPACES DISPLAY "SPACES" ELSE DISPLAY "SUBFLD3" DISPLAY "END" ELSE DISPLAY "SPACES" DISPLAY "END". (a) SUBFLD1 SUBFLD3 END (b) SPACES END (c) SUBFLD1 END (d) SUBFLD1 SPACES

TCS,

7 10477

88 level entry is used for (a) data items in WORKING-STORAGE SECTION (b) items with RENAMES clause (c) condition-names (d) None of the above

TCS,

5 11119

ZEROES and SPACES are _______ constants (a) Figurative (b) Numeric (c) Non-numeric (d) Alphabete

TCS,

4 9286


Post New COBOL Questions

Un-Answered Questions { COBOL }

Name the divisions, which are available in a cobol program?

1298


If you are current on the owner of a set, what is the difference between an obtain next and obtain first? Actually in which topic will we use dis???Plz explain it clearly

3214


Write a program to explain size error.

1240


What are the different rules for performing sort operation?

1283


What type of SDLC u followed? Why?

2054


What is rmode(24)

1199


How to find out the closest prime number of an input number? I believe it has something to do with SEARCH and COBOL Linear Array.

4213


How to remove 2 duplicate records and copy only one using job control language?

1262


explain sorting techniques in cobol program?

1248


Which mode is used to operate the sequential file?

1257


Which is not true about evaluate statement

2515


what are decleratives in cobol?

2311


In COBOL programming, what is PERFORM? What is VARYING?

1211


What are the cobol coding sheets?

1365


What is redefines clause in COBOL?

1351