consider the following two statements MOVE 10 TO N PERFORM PARA-X N TIMES STOP RUN PARA-X MOVE 5 TO N how many times PARA-X willbe exicuted? a.10 b.5 c.infinate d.execution error
6 11726given the following: 77 A PIC 9V9 VALUE 9.5 77 B PIC 9 VALUE 9. 77 C PIC V9 VALUE 0.8 77 D PIC 9 77 E PIC 9 77 F PIC 9V999 what are the contenta of D E nad F after the following statements are executed: COMPUTE F ROUNDED=A+C/B MULTIPLY A BY C GIVING E ADD B C A GIVING D ROUNDED a.F=9.589 E=8 D=1 b.F=9.589 E=8 D=9 c.F=9.589 E=7 D=9 d.F=9.589 E=7 D=1
5 12120A LESS 1200 IF B GREATER 25 MOVE 47 TOC ELSE MOVE 57 TO C IF A GREATER 249 MOVE 67 TO C ELSE NEXT SENTENCE ELSE IF B LESS 67 MOVE 27 TO C What will be the value of C, when A is 137 and b is 25
TCS,
3 5256Consider the following: 77 W-NUM PIC 9 VALUE 0 ------ MOVE 1 TO W-NUM PERFORM PARA-X UNTIL W-NUM > 9. ------ PARA-X ADD 1 TO W-NUM How many times PARA-X is executed ?
14 19440Consider the following code: 77 A PIC 99V99 VALUE 55.35 77 B PIC 99V999 VALUE 32.754 ADD B TO A ON SIZE ERROR DISPLAY "ERROR!!!" What will be the result ? (a) A=88.10, B=32.754 (b) A=87.00 B=32.754 (c) A=87.10 B=32.754 (d) ERROR!!! will be DISPLAYed on the screen.
TCS,
3 10987Consider the following: 77 A PIC 9(10) 77 B PIC 9(10) 77 C PIC 9(19) MULTIPLY AB BY B GIVING C Which of the following is true ? (a) The execution of the above may result in size error. (b) The execution of the above will result in size error. (c) The definition of C is invalid resulting in compilation error. (d) No error will be thee and the program would proceed correctly.
TCS,
4 7308A paragraph PARA-X is to be executed when none of the data names A, B and C have value of 1. Which of the following will achieve this ? (a) IF A NOT = 1 OR B NOT = 1 OR C NOT = 1 PERFORM PARA-X (B) IF NOT A= 1 AND B= 1 AND C = 1 PERFORM PARA-X (C) IF A NOT =1 IF NOT B = 1 OR C= 1 PERFORM PARA-X (C) IF A NOT = 1 AND B NOT = 1 AND C NOT = 1 PERFORM PARA-X
TCS,
3 5749Identify the invalid dataname from the following: (A) savings-account (B) annual-allocation-for-overhead (C) samount250 (D) 12demand
TCS,
4 6102Study the DATA DIVISION entries and the three PROCEDURE DIVISION entries given below: 01 END-OF-FILE-SWITCH PIC XXX. 88 NO-MORE-RECS VALUE "YES". 88 MORE-RECS VALUE "NO". (i) READ SAMPLE-FILE AT END MOVE "YES" TO NO-MORE-RECS. (ii) IF NO-MORE-RECS = "YES" GO TO LAST-PARA. (iii) IF NO-MORE-RECS GO TO LAST-PARA. Which are wrong? (a) (i) and (ii) (b) (ii) and (iii) (c) (i) and (iii) (d) all
TCS,
5 6697The following entries appear in the WORKING-STORAGE SECTION: 01 DATE-TODAY. 05 YY PIC XX VALUE "90". 05 MM PIC XX VALUE "12". 05 DD PIC XX VALUE :31". 01 DATE-EDIT PIC XX/XX/XX. MOVE DATE-TODAY TO DATE-EDIT. (a) 901231 (b) 90/12/31 (c) 31/12/90 (d) 311290
TCS,
4 7010How many bytes will be allocated for the following record description entries? 01 REC-A. 05 A PIC S9(4). 05 B PIC XXXBXXX. 05 C PIC ____9.99. 05 D PIC S9(5) COMP-3. 05 E PIC 9(3) COMP.
16 20807What is wrong with the following data declaration? 01 W-DATE PIC X(6). 05 DD PIC 99. 05 MM PIC 99. 05 YY PIC 99. (a) Nothing is wrong. (b) Under W-DATE all level 05 items are having a PIC 99 but level 01 has PIC X(6). (c) PIC can't be specified for a group item. (d) DD, MM, and YY are invalid datanames.
6 11079What is the output generated by the following code? 01 GRP-I. 05 SUBFLD1 PIC XX VALUE "AB". 05 FILTER PIC X(6) VALUE SPACES. 01 GRP-2 REDEFINED GRP-1. 05 SUB-FLD2 PIC XX. 05 SUB-FLD3 PIC XX. 05 FILTER PIC X(4). IF SUB-FLD1 NOT = SPACES DISPLAY "SUBFLD1" MOVE "ABBCCD" TO GRP-1 IF SUB-FLD3 = SPACES DISPLAY "SPACES" ELSE DISPLAY "SUBFLD3" DISPLAY "END" ELSE DISPLAY "SPACES" DISPLAY "END". (a) SUBFLD1 SUBFLD3 END (b) SPACES END (c) SUBFLD1 END (d) SUBFLD1 SPACES
TCS,
7 807388 level entry is used for (a) data items in WORKING-STORAGE SECTION (b) items with RENAMES clause (c) condition-names (d) None of the above
TCS,
5 8914ZEROES and SPACES are _______ constants (a) Figurative (b) Numeric (c) Non-numeric (d) Alphabete
TCS,
4 7574
Write a program to enter and display the names of students in a class using the occurs clause.
For rewrite, why is it mandatory that file needs to be opened?
In which area will you utilize 88 level items in cobol?
What is the LINKAGE SECTION used in COBOL?
How many sections are there in data division in COBOL?
i need a small 3d program using inline and outline.
write a cobol logic. i have file that has 10 records .1 record go to first output file and second record goes to 2 output and etc
What is a report item?
What is amode(24), amode(31), rmode(24) and rmode(any) (applicable to only mvsesa enterprise server) ?
What is the difference between external and global variables in COBOL?
Name the divisions, which are available in a cobol program?
Why occurs cannot be used in 01 level in COBOL?
What is the difference between Call and a Link?
How do define dynamic array in cobol.
how do you reference the printer file formats from cobol programs