Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • Convergys aptitute test questions (1)
  • Convergys interview questions (145)
  • Convergys placement papers (3)
  • Convergys technical test questions (4)



Convergys Tourism Hotel AllOther Interview Questions
Questions Answers Views Company eMail

I have to give interviews in various airlines for cabin Crew.So,plz tell me abt various ques. Which r expected by Them

6 24329

Post New Convergys Tourism Hotel AllOther Interview Questions



Un-Answered Questions

Write a nonrecursive routine to reverse a singly linked list in O(N) time.

2197


How to change a specific IDAPI configuration setting?

765


what is FS cable?? Difference between FS and FRLS??

1387


in my working site. momentary jerck in electrical supply ocurred frequently which cause of multiple losses in our electrical equipements. how can we protect our electrical machines and equipements in this situation.

1433


How to define a cusotmer as a supplier in ORACLE R12

989






What is the use of INV-Receipts and PO-Reciepts,Just give me the Differences&When,At what Instances to use Them...?

11211


Define liftable weight of a transformer? Does the total weight of transformer include oil weight?

1041


In the formula : Knee point voltage = Burden X alf / class, Please inform what is alf? regards Shashidhar M.R.

1969


how gradation of aggregates effect on slump of fresh concrete?

1020


how pt is using

663


What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete

5004


There are two chlorination tonners both are connected to two pressure swithes and the pressure switch is connected to SOV which operates the valve to changeover the tonner selection i.e if pressure one tonner goes low the other tonner should come in line if it is inautomatic selection design a circuit using relays ?

620


What is Partial Discharge test .Please specify that this test can be test on 11/0.433 KV,630 KVA Transformer.

1069


I need the recommended size for a 3 phase transformer at 13.8 KV Primary and connected loads of 3000 kVA at 4200 volts and 2375 kVA @ 480 volts AC.

720


accounting document is not getting generated for sto process. where is the control for this ? Thanks in advance

204






Convergys Tourism Hotel AllOther Interview Questions
  • C (2)
  • OOPS (2)
  • Programming Languages AllOther (1)
  • Shell Script (1)
  • Networking Administration (1)
  • Forms Reports (16)
  • SQL Server (2)
  • QTP (2)
  • Testing AllOther (3)
  • JCL (7)
  • HR Questions (3)
  • Oracle Apps Technical (14)
  • Electronics Communications (1)
  • Aeronautical Engineering (1)
  • Engineering AllOther (2)
  • Marketing Sales (1)
  • Human Resources (1)
  • Non Technical (1)
  • Accounting General (1)
  • Accounting AllOther (1)
  • Call Centre AllOther (81)
  • APPSC AllOther (1)
  • Law AllOther (1)
  • Tourism Hotel AllOther (1)
  • Teaching (1)
  • Placement Papers (3)
  • USA Student Visa F1 Visa (1)
  • Australia Visa (1)