Jindal Electrical Engineering Interview Questions
Questions Answers Views Company eMail

why do power factor in the three phase induction motor increases with the load ???.

3 11292

how we arrange the hv side with delta connection in case 33/11kv of transformer.

1322

why motor starting current is High ?

11 19948

thermal power station operation in general

11 28306

I have 4 DG set with 1500KVA rating. system breakers are 11KV & alternator are 415 Volts. Between alternator & breaker one stepup transformer used. i want to Know what is max. resistance for body earthing & 415 & 11KV V Neuteal earthing. my fault current is 14 times for 2 sec.

1610

What is the PIU.

1 1912

Why HT cable have only 3 core ?

10 24009

What is mean by PID controller? And what is its Long form?

9 26023

In AC Drives How can change & control its output Frequency?

5 5890

What is Difference Between Induction Motor & Servo Motor

31 91295

what is open star connection or open delta.

1 5462

what is two wattmeter test

2 6062

what r the preventive maintenance of air compressor

1 1512

IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace.

1 2911

why our indian system choose the 230 volt for single phase&415 for 3-phase voltage,in forign side 110 volt is used what is the difference

4 17884

Post New Jindal Electrical Engineering Interview Questions


Jindal Electrical Engineering Interview Questions


Un-Answered Questions

Explain controlling area. How do you assign it?

387


What is main in java?

307


how do you analyze the time elapsed between the activities in process?

311


Describe about Bacteria colonies and strange colours ?

1347


in webui how can we make a field mandatory

861






What is demand planning?

364


What is ctrl e in word?

188


What is clrscr ()?

396


What are formal parameters?

440


Contract documentation is an input to the Contract Closeout process. Contract documentation might include all of the following except: A. Supporting documents B. Contract changes C. Financial documents D. Procurement audit documents

394


Why are 'financials', the first module implemented in many indian erp implementations?

339


What are the disadvantages of indexes?

346


Which engine is used to create analytic view?

35


What is One Rank One Pension Scheme?

445


why industry prefer ht motor instead of lt motor.

1397