while extending the material master view after saving error
is coming that the field material number is defined as a
required field,it doesnt contain an entry. After selecting
that it is showing the particular material may be locked.
Pls do the needful.
Answers were Sorted based on User's Feedback
Answer / razesh
It means either you/somebody are viewing the material in
seperately with mm02 tcode.So it says locked by user XXXX,
and you can know the user also.ask him to exit and try to
save it.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / pradeep
If some body or your self is working with the same material
then the material will be locked, then u need to close the
related sessions or go for lock entries sm12 for release
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / vikram patil
You have need exit from material change session
Is This Answer Correct ? | 0 Yes | 1 No |
list the important tables used in pp.
what is the major ticket in your experience
Mention how mrp (material requirement planning) types are classified?
Define 'sop' (sales & operations planning)?
What is a ‘routing’ in pp?
Explain the planning steps for 100 products?
what is the consumption based planning ?
2 Answers Gupta Power Infrastructure, Webcom,
If MRP type PD/ND in material master how will work flow.?
How is indian slab and us slab?
what is the significance of process order over production order
5 Answers Cap Gemini, IBM, PCS,
What is collective order. Pre requisite of the collective order?
In project the customization is comes under which phase?