6. Difference between controlling area currency &
company code currency?
Answers were Sorted based on User's Feedback
Answer / sap fico cons
Hi FZs,
For Currency their are two case are their:
Case I :-
if Cocode = Coarea then Currency of Cocode is equal to
Controlling Area.
Case II :-
If Cocode is not Equl to Coarea then it is called as cross
company code. in this case u can assign one or more
currency .
coarea currency should be different than in cocode currency
Is This Answer Correct ? | 31 Yes | 4 No |
Answer / venkat
Company code and Controlling area both are the different
organizational Units.
where Company code is using for external reporting purpose.
Where controlling area is using for internal reporting area.
Is This Answer Correct ? | 20 Yes | 6 No |
Answer / venkat
At the time of Maintain controling area we give company
code currencey 10
Inthe currency field we give 10 all basic setting comes
automatically
Both are the same
In the maintain controlling area we shoulg be give the
company code currency
Is This Answer Correct ? | 4 Yes | 18 No |
I have created a Document number 1.Then later i corrected it,will the document number b changed,If i dont want the document number to b changed what should i do.
while running depreciation(TC:- AFAB) for first time (posting period 001) under test run system don't show any error and no document is pickup by the system. plz help me solve this problem
Hi, friends can anybody solve this issue? while i'm trying to post customer invice through t-code f- 22 this isssue raising, Document number for general ledger document could not be determined"
Is it possible to update the results of the standard cost estimate to other fields such as commercial price, tax price fields in the accounting view?
What are one-time vendors?
Hai anybody can tell me what's the answer. A} what account group and what does it control. b} how do you control field status of gl master records and from where do you control.
Use of Leading and Non-Leading ledgers in Asset Accounting
What is dummy cost center?
how we get the information about oss msg or error msg that wat mistake we have done as configurater while doing configuration
Can you assign more than one company code to a company ?
What do you mean by assembly scrap and how is it maintained in sap?
Can Vendor be Your Customer ? If yes give one Scenario.