It is possible to carry out two different pricing
procedures at sales order level and billing document level.
The pricing procedure is determined in a document on the
basis of the following parameters:
1) Sales Area (Sales Organisation+Distribution
Channel+Division)
2) Customer Pricing Procedure (Defined in the Customer
Master)
3) Document Pricing Procedure (Defined in Document Type
Customisation)
For a sales order and a billing document which corresponds
to the same sales order, the document pricing procedure can
be different and hence different pricing procedures can be
determined.
Also, in the copy control from sales order type to billing
document type, the price type for item category should be
set to "B" i.e. carry out new pricing.
Is This Answer Correct ? | 17 Yes | 3 No |
Answer / hemraj
as you know pricing procedure is determined by
sales area + doc. pricing pro. + customer pricing procedure
document pricing procedure will come from sales document
types and Billing Types.
customer pricing procedure will come from customer master
Between the sales document and billing document the only
factor that could change is the document pricing procedure
If they do not differ the same pricing procedure would be
used and the control would be as per the configuration
given in the copy controls.
If they differ then new pricing procedure determination
will be carried out but for that in copy control we need to
maintain PRICING TYPE AS B carry out new pricing else it
will give you error saying pricing procedure could not be
determined
Is This Answer Correct ? | 5 Yes | 0 No |
This happens when you are ordering before budget & you are billing after budget and you want to include new tax condition type in the pricing procedure.
SAP SD pricing procedure determination is by sales area, customer PP, document PP.
If you change document PP it will determine new pricing procedure.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rohit
Pricing procedure is determinded by the following criteria
Sales Area comprising of Sales organisation, distribution
channel and Division
Document Pricing procedure
Customer Pricing procedure
On the detailed screen for the document type there is a
field called document pricing procedure where you maintain
A, B or watever desired
So similiary for the Billing document u maintain the
Document pricing procedure.
While doing the assignemtn of the pricing procedure you can
maintain it differently for both of the Sales order and the
Billing document
Is This Answer Correct ? | 1 Yes | 3 No |
Answer / ashraf
No Pricing Proc. can not possible to two level, Pricing
Proc. can be possible either sale doc. level or Billing
Doc. level.
ASHRAF
ashrafsheikhsap@rediffmail.com
Is This Answer Correct ? | 1 Yes | 3 No |
Answer / peeyoosh
Normally it remains the saem as that at Sales order level.
However, if you are maintaining a pricing procedure at both
Sales order and Delivery levels, then the pricing procedure
at Billing level can be a combination of both, thus
differing the one at Sales order level.
Also you can carry out settings in system to keep the
values of condition types same at both levels and different
at both levels through setting in copy control.
Is This Answer Correct ? | 3 Yes | 12 No |
Recently i am faced an interview. Interviewer asked me "Tell me about the project(Implementation project). What is the perfect answer for this question. Tell me anybody. Its urgent. Thanks in advance.
Hi guys. When ever i want to delete the assignment Plant to shipping point i am unable to do that. System shows me "shipping point 0001 is still assigned to a picking location. How can i rectify this problem. Pls tell me. Thanks
How to have one pricing at sales order level and different pricing at invoice level? what are the configuration to be done for this?
In Pricing Suppose we went to VK11 and in PR00 condition type if we gave value as Rs 100 /- then we have raised an sales order. Again we have gone to VK12 t-code and changed tyhe amount to Rs 120/- and changed the validity period as current date then in delivery & Billing documents which price the system takes into account i.e Rs100 or Rs120? Give a detailed explanation & logic to substantiate your answer. I have been asked this question in an recent interview. Thanks& Regards
From where system picks VAT registration number?
I have 10 years exp in SAP Enduser, 1 month back i have completed by courese. Please suggest
we are using order related billing and billing get generated automaticaly in overnight run.As my q is user has cancel the biliiing document after creating that one.but after cancelation no cancel accounting document get generated.so sales order remain closed and no billing document get generate in overnight run.but when user has created the Credit memo order with respect to cancel billing document the respective sales order get open and billing document get generate in overnight run.so can you please tell me hwo the system come to knoe after rasing the credit meno order that billing document has cancled and sales order has open so the billing document will be craete.please help me regarding thsi query.
What's the differance between SALES AREA & BUSINESS AREA??
hi friends i am Manohar from hyderabad.i have recently completed MBA+SAP SD -now i am looking for a job-what is best way to get job? can get job as fresher? or with fake experience? i am in a confusion plz help how to approach companys or consultancy which can provide sap job? plzzzzzzzzzzz
what is the difference between sd account key and fi account key?what si a variant and its use?
How you can extent the rebate? What are the procedures, what is the customisation for it?
please let me know the link for sap mm functional consultant,sap sd functional consultant,sap bw functional consultant. awiting the reply