What do you mean by review? How many reviews are there in
manual testing? please explain those?
Answers were Sorted based on User's Feedback
Review is a process or meeting where we check the
correctness of the documents based on the organization
standard. Are we following the right coding standard, right
test case preparation methods or template.
Primarily, reviews can be divided into two parts:
Formal review
Informal review: code review, peer review, walkthrough
Formal review: inspection,
Formal review has defined entry and exit criteria, done in a
very formal way with moderator, and all
Informal is just a friendly way of checking the documents
that covers requirements, should be correct as per the
standard defined by the organizational process.
Is This Answer Correct ? | 19 Yes | 2 No |
Answer / nandini
In manual Testing, few reviews are there. test plan review,
testcases review, test scenarioes, coding review, bug
review...
for example once the tester complets writing testcases,
some senior person have to review that testcases document
and they have to review that whether testcases are correct
or wrong.
correct me if i am wrong...
Is This Answer Correct ? | 7 Yes | 4 No |
Answer / ram.polavarapu
reviews are conducted weather the employees are following
the standards are not,reviews are going to conducted by the
project manager
there are four types of reviews
1)formal reviews->reviews are conducted as per the schedule
ex->design reviews,requirement reviews,test case
reviews,project status reviews
2)informal reviews->reviews are conducted as per the un-schedule
3)walk through reviews->go through the document and explian
to team members
4)inspections->conducted by the management to verify the process
Is This Answer Correct ? | 3 Yes | 0 No |
What is the V-model?
What is Testcase? How to define seviority and priority of a bug?Explain me with example?
If there are more number of test cases, how can u pick up a selective test case?
1.what si the out come of testing.?
how to write manual testcases for download the files from the template. for example:from product cost enddate
Roles and responsibilities of TL
How do you define a testing policy?
Lets say,you are not finished with testing a application,your manager gives you a new task,how do you prioritize your time,what should you do
Where do you get your expected results?
I am planning to write certification exam ISTQB on 19t of sep i have no idea on testing can you help me with material,frequently asked quetions and how much time it takes to prepare certification exam
what is the process followed in JAVA Testing compared to Normal Testing process.
can anybody able to provide me answer with real time example....1) 5 critical,major & low severity and 5 critical,major & low priorities