Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


When requirement / SRS document comes to a tester then Do
we prepare the test cases +ve & -ve at a time?

Answers were Sorted based on User's Feedback



When requirement / SRS document comes to a tester then Do we prepare the test cases +ve & -ve ..

Answer / alok

Sunitha you are correct.
Srs/Frs cointains all the requirements ao we can write all
possible types of test cases for different scenario.
If need any type of more information mail me
er.qtptester@gmail.com

Is This Answer Correct ?    1 Yes 1 No

When requirement / SRS document comes to a tester then Do we prepare the test cases +ve & -ve ..

Answer / rajendra prasad

U r correct sunitha.

Not only +ve And -ve testcases tester must think about
inmplicit requirements also.

SRS Document defines each and every requirement that client
needs.

Byee

Rajendra
rajendra_penumalli@yahoo.com

Is This Answer Correct ?    0 Yes 1 No

When requirement / SRS document comes to a tester then Do we prepare the test cases +ve & -ve ..

Answer / smit

Hello Above Question is posted by me
AND MY Next Question to above Is :

If we prepare +ve & -ve test cases [Say 1-20]for Version
say 2.0 if tester get the new build with some feature added
to it say 2.1 Now we have to write the test cases for new
build 2.1 [ I mean to say +ve & -ve] then My next test case
id will be 21 onwards BUT I read that +ve test cases should
be executed first .But If I write Test case for 2.1 then my
sequence of +ve first will get disturb. So

PLEASE GIVE PROPER ANSWER TO This Question

Is This Answer Correct ?    1 Yes 2 No

When requirement / SRS document comes to a tester then Do we prepare the test cases +ve & -ve ..

Answer / sunitha

As far as I know,

whenever SRS given to us initially all the possibilities i
mean to say, the test cases regarding all the scenarios
that u think of whether positive or negative should be
written in test case document.





could anybody please correct me if i am going wrong

Is This Answer Correct ?    1 Yes 4 No

Post New Answer

More Manual Testing Interview Questions

1. Write configuration tests for a web based application. 2. How does a plane turn on ground? Explain with logic. 3. How would you test the volume control for a music system? 4. You have been given an application and you have only 15 mins to test the application. How would you do the testing? 5. Your machine, which is on a network has been disconnected. How you debug the problem? 6. What is the sum of numbers from 1 to 1000? 7. What is the probability that on rolling four dices same number appears on all dices? 8. You have been given 8 identical balls out of which one of them is heavier. How would find the heavier ball in the least number of tries with the help of a balance? Explain 9. There is a disc which has been painted half black and half white. You have been given sensors which could detect white or black colors. The disc is revolving in either clockwise or anticlockwise direction with variable angular speed. Find the minimum number of sensors required to determine the direction of rotation of the disc. 10. 64,54,42,31,20 which number does not fit in the series?

8 Answers   QLogic,


Do you think tools are required for managing change. Explain and please list some tools/practices which can help you managing change.

0 Answers   Ordain Solutions,


What is the difference between Project Based Testing and Product Based Testing?

4 Answers   Scandent,


who can we do the performace test for hotmail or yahoo or gmail. when you working with your personal system. or labtop.

0 Answers  


What is Bicycle Testing?

1 Answers   ACI Worldwide,


Consider if there is no Test lead, No Test Manager and QA Manager. If you are the senior test engineer, you are getting pressure from the client to give the build. But you see that, there r 5 high and 5 low sevierity bugs. So, what you will do and how you interact with the client.

14 Answers   Sonata, Xerago,


Amounts not dispatch in ATM what are all scenario to test?

1 Answers  


define with example high severity and low priority ? 2.low severity and high priority? 3.both are high? 4.both are low ?

2 Answers   ACS, Siemens, TCS,


Which are the basic challanges are face tester while doing testing?

2 Answers  


When requirement / SRS document comes to a tester then Do we prepare the test cases +ve & -ve at a time?

4 Answers  


what is difference between defect tracking and bugs tracking

4 Answers   Infosys,


What are the object repositories for QTP????friends Plz help me in finding answer for the above....thanq

1 Answers  


Categories