Answer / paras kaushik
Scan for Channels [DL MAP, UL MAP ]
Ranging [RNG RSP, RNG REQ ]
Capability Negotitaion [ SBC RSP, SBC REQ ]
Authorization
Registration
IP Connectivity
Service Established
| Is This Answer Correct ? | 17 Yes | 3 No |
Answer / jayakumar_king
1. BS MAC Start
2. SS Scan for the DL MAP
3. Ranging jayakumar Kausalya Shree
4. SBC
5. Authentication
6. Registration
7. Establish IP connectivity
8. DSA
9. Data transfer
| Is This Answer Correct ? | 14 Yes | 10 No |
Go to the Section of Network entry and Initialization of
wimax std 802.16d (page 167, section , 6.3.9)
The phases are :-
1. It scans the download channel and established
synchronization with the BS (Base station)
2. Obtain the transmit parameter (from UCD message)
3. Perform ranging.
4. Negotiate basic capabilities.
5. Authorize SS and performs key exchange for privacy.
6. Perform registration.
7. Established IP connectivity.
8. Established TOD (time of Day)
9. Transfer operational parameters.
10. Setup connection .
Get many more related this..
http://ittipsandtrics.blogspot.com
| Is This Answer Correct ? | 4 Yes | 0 No |
What is the bug life cycle?
Which types of testing do u do in u r organisation.
What are the major components of Perf Test Report?
what are reviews(eswar)
Test case preparation time Vs Test case execution Time. Say for example if 500 Man hour takes to prepare test case then how long test case exexution will take?
what comments have u given in peer review? tell me at least 3 comments what u have given? july27 brahma412@yahoo.co.in
what is pareto analysis?
Hi, I want "Intergraph" placement papers for experienced people which was conducted recently in Hyderabad. Thanks, Purnima.
How and when can the Testing Organization detect software defects?
r there any openings for 1+ experienced candidates in Manual Testing? If there r any, please let me know!!
what is the difference between quality assurence and quality control
why we develop Test plan for a project ?