STLC is software test life cycle it starts with :-
1. Preparing the test strategy
2. Preparing the test plan
3. Creating the test environment
4. Writing the test cases
5. Creating test scripts
6. Executing
7. Analyzing the results the test scripts and reporting the bugs
8. Doing regression testing
9. Test exiting
Plz correct me if i m wrong...
Regards.
nitin9360@gmail.com
| Is This Answer Correct ? | 19 Yes | 4 No |
Answer / shweta
STLC consists of the following :
Prepare for test Plan
Test Design
Test Execution
Bug reporting
Inspection and release
Client Acceptance
Support during acceptance testing
Test summary report
| Is This Answer Correct ? | 16 Yes | 8 No |
Answer / lintymol k.j
STLC is Software Testing Life Cycle.It contains 7 Phases
1.Test planning
2.Test Analysis
3.Test Design
4.Costruction and Verification
5.Testing Cycles
6.Final Testing and Implementation
7.Post Implementation
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / pavan
Software testing life cycle contains 6 phases
1. Test plan
2. Test development
3. Test execution
4. Result analysis
5. Bug tracking and
6. Reporting
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / madhu
Identifies what test activities to carried out and when to
accomplish those test acyivities is called "test life cycle".
testing life cycle:
1)requirement phase
2)test analysis phase
3)test design
4)verification
5)test executon phase
6)result analysis phase
7)bug tracking
8)bug tracking and reporting
9)final implementaton
10)post implementation
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / harish
STLC phases are
1.review design/requirements
2.test plan
3.test design
4.test execution
5.defect tracking and reporting
6.test result analysis
7.test closer.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / prasanna
test plan,
test case,
test execution,
defect tracking,
reports
| Is This Answer Correct ? | 6 Yes | 7 No |
Answer / qa
STLC will have following phase:
1. Test plan
2. Test case
3. Executioin of test case
4. Bug reporting
5. Test Summary
| Is This Answer Correct ? | 2 Yes | 3 No |
Answer / abhishek kalla
Test requirement
Test Planning
Test Environment Setup
Test Design
Test Automation
Test Execution & Bug Tracking
Test Sign Off & maintenance
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / diya
Test plan preparation
Test case design
Test execution and test log preparation
Defect tracking
Test report
| Is This Answer Correct ? | 0 Yes | 1 No |
anybody there with 3+ exp in software testing looking for change and like to work in bangalore fwd your resume to vinodhanandhan@gmail.com
how do u connect data base in td?
what is Difference between Test Cases and Test Plan ? Give some Example Both of them
what comes first test strategy or test plan
Hi everyone.This is one of my interview questions.Could you please send me the answer for this?My ID:spam4rekha@gmail.com Q : what is BVA and ECP ? Thank You rekha
Difference between the stress and load testing?
pls explain perfomence testing and strees testing load testing
Hi, Plz have a look on the following questions? Test Life Cycle, Regression,Performance, diff b/w system & integration, SDLC..
hi all, i am new to testing environment.i have two questions 1.what is the difference between volume test and load test.? 2.generally ,what is the output for stress testing.?because it is beyond the limit.and what is the use of stress testing?
Which one of the project team members bears the responsibility of deferring new functionality to a later release?
say me any problem u faced in the project after delivering to client?
IF ASCII_CODE_OF_ENTERED_CHAR is less than 44 THEN reject it ELSE IF ASCII_CODE_OF_ENTERED_CHAR is greater than 56 THEN reject it ELSE it's a digit, so accept it Which one of the following sets of ASCII codes do you use to test the sample code above WITHOUT redundant coverage?
0 Answers CA, Dish Network, Wipro,