Answer / riyaj
as per my knowledge what shilba_sap told is right.
But iwant elaborate bit more.even though the process is
same as said by shilba.
Whatever the configuration done by da consultant and he
saves that configuration automatically system will generete
one request (in Ver 4.7c and above).All the configuration
what v did in the development server is stored in this
request.wen v want to test this configuration,it should be
transferred to quality server which is done by BASIS
consultants.
Process:
Tcode-Se09/10, select our request which v want to release to
Basis guy, n then choose the release buttion(lorry icon)
that means now itz ready to release for basis guy
from dev to quality
Tcode- STMS(Sap Transport Management System),he ll find all
released requests by the consultants.Now he choose the our
request and transeferred it to quality.
There we will do the testing like whether outcome result is
met with expected result or not.
if the testing is successful.then by the similar process
above basis guy transferred the configuration to production
server.
and u send the mail to enduser and tell him to use
it.after using n that configuration running successfully
enduser will send you the return mail stating that your
configuration is working properly.
Now again you send the mail to concerned person(TL
or PL)with the enduser's mail as attachment.
then they will close that ticket.
i.e. da process to close the ticked (as per my Knowledge and
how am closing the tickets)
for all the above mails we are using Outlook Express.
*any queries welcome
Yahoo Id: ari_819 -------Raj ,TCSL,hyd
Is This Answer Correct ? | 12 Yes | 0 No |
Answer / shiba_sap
Dear Hemanth,
I think you can do it in the following manner:
(1) Go to SE10.Find your request number ,then you will see
one development request number and one correction number.
(2) First click on correction number and the goto toolbar
and click on the transfer request button(lorry icon).
(3)The at the bottom bar you will find the change icon will
transfer in a RED-YELLOW-GREEN sequnce.once it became red
you will know that it has succesfully transferred.
(4)Now again go to find your request number and transfer it
in the same manner.
So in this way you can transfer the request from dev.
server to quality server.
Is This Answer Correct ? | 13 Yes | 2 No |
Firstly create a transport request with changes in a system.
Then you release it.(SE01).
Next, Basis will import the TR to the system you required where the changes should ultimately happen.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / reshmi
Via SCC1 you can transport customized request in target client whr u want to transfer from source client.like if u want to transfer from 200 server to 800 then u can transport it through SCC1 in target client.
Is This Answer Correct ? | 0 Yes | 3 No |
Answer / k. hemanth kumar
with ALE(APPLICATION LINKING AND ENABLING)
Is This Answer Correct ? | 3 Yes | 8 No |
In what manner copy control transition can be done?
Diff. between inquiry and quotation?
What are the special sales document types?
what is mean of rebate processing?
Hi! all, in SAP SD, I'm creating a customer in Tcode: XD01 & Im able to save the Customer & an Number is assigned for the following Customer through the Internal Number that has been assigned to the relevant Account Group. Everything is going fine till I the system generates the Customer Number. But when I check for the same Customer Number in XD02 / XD03, I get an Error saying that - "The Customer doesn't exist or not created". I have checked the Number Ranges & they are perfectly assigning the number sequence but I'm unable to retrieve the Customer info from the CMR. The Customer created is also not visible in the Tcode: VCUST. Could anyone help me resolve this particular issue, at the earliest please.
what is otc(order to cash) process
There are 2 materials,for 1 material we need to create credit note (in return order) and for another material we donot want credit note (return order procerssing). is there any standard settings? or by enhancements? then how?
How can you dynamically display only the lowest level of accounts (level six) in a Report?
Over head cost controlling component enables you to plan, allocate, control and monitor overhead costs. What are all fall under over head cost controlling?
What is the importance of reconciliation account in customer master?
Can somebody tell...how the configuration is done for the automatic appearance of delevery date...loading date....transportation date..picking date...packing date...etc when we create delivery after sales order transaction? Step-wise configuration answer will be appreciated?