What is the priority in fixing the bugs?
Explain the severity u rate for the bugs found?
Answers were Sorted based on User's Feedback
Answer / rajendra
Priority-it tells the importance given for the bug
resolving.
this will be given by the programmer or project
lead/project manager.
severity- it tells that how sevior the bug affects the
functionality of the application.this will be given by test
engineer.
Byeeee friends
Rajendra
rajendra_penumalli@yahoo.com
9885162742
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sindhuja rao
priority in fixing the bugs are:
P1-fix it now, fix it immediately
P2-fix it later,Fix it before the next mile stone
P3-optional
severity levels:
S1-show stopper(urgent)
s2-workaround (medium)
s3-Low
Is This Answer Correct ? | 1 Yes | 0 No |
i) functional test cases can we consider for regression test ? or we have to write separet test cases for regression test ? ii) How to write the system test case and what are the technique shall we have to follow ?
Explain me in detail V model with diagram?
advantages of test plan in software testing? the interviewer asked what is the use of test plan, as we always dont follow the test plan.
what is the diff between application server and data base server?
What are the possible scenarios for LMS?
which process u followed in ur company?
4 Answers CarrizalSoft Technologies, Microsoft,
what is Fault based testing?
Acceptance testing is designed whether or not the software is FIT for the user to use. The concept of FIT is important in both design and testing. There are four components of FIT. State these 4 components?
Smoke testing done by whom
i have a phone with 2 buttons first one is a record button and second one will attach the audio to mail can you tell me test case for this ?
if we have normal testcase,it is failed, and regression testcase is also failed.what is the bug present in both the testcases?
tell me about severity and priority with example
3 Answers Sierra Atlantica, Verizon,