what is cmmlevel each and everystage i want to complete
details please any one mail me i want to complete details

Answers were Sorted based on User's Feedback



what is cmmlevel each and everystage i want to complete details please any one mail me i want to c..

Answer / madhu somala

Capability Maturity Model (CMM):

An organization may be assessed by an (Software Engineering
Institute) SEI-Authorized Lead Appraiser, and will then be
able to claim that they have been assessed as CMM level X,
where X is from 1 to 5.

The SEI maintains a list of organizations assessed for CMM
since 2006.

There are five levels defined along the continuum of the
CMM, and, according to the SEI: "Predictability,
effectiveness, and control of an organization's software
processes are believed to improve as the organization moves
up these five levels.

1.Initial (chaotic, ad hoc, individual heroics) - the
starting point for use of a new process.

2.Repeatable - the process is able to be used repeatedly,
with roughly repeatable outcomes.

3.Defined - the process is defined/confirmed as a standard
business process, and decomposed to levels 0, 1 and 2 (the
latter being Work Instructions).

4.Managed - the process is managed according to the metrics
described in the Defined stage.

5.Optimized - process management includes deliberate process
optimization/improvement.

At maturity level 5, processes are concerned with addressing
statistical common causes of process variation and changing
the process (for example, to shift the mean of the process
performance) to improve process performance. This would be
done at the same time as maintaining the likelihood of
achieving the established quantitative process-improvement
objectives.

The CMM model proved useful to many organizations, but its
application in software development has sometimes been
problematic. Applying multiple models that are not
integrated within and across an organization could be costly
in terms of training, appraisals, and improvement
activities. The Capability Maturity Model Integration (CMMI)
project was formed to sort out the problem of using multiple
CMMs.

For software development processes, the CMM has been
superseded by Capability Maturity Model Integration (CMMI),
though the CMM continues to be a general theoretical process
capability model used in the public domain.

Capability Maturity Model Integration (CMMI):

CMMI according to the SEI helps "integrate traditionally
separate organizational functions, set process improvement
goals and priorities, provide guidance for quality
processes, and provide a point of reference for appraising
current processes."

CMMI currently addresses three areas of interest:

(1) Product and service development — CMMI for Development
(CMMI-DEV),

(2) Service establishment, management, and delivery — CMMI
for Services (CMMI-SVC), and

(3) Product and service acquisition — CMMI for Acquisition
(CMMI-ACQ).

Is This Answer Correct ?    4 Yes 0 No

what is cmmlevel each and everystage i want to complete details please any one mail me i want to c..

Answer / tsri

Req management
Project planning
Project tracking and oversight
Software quality assurance
S/w configuration management
Measurement and analysis
Sub contract management
Training
Organization process focus
Organization process developement
Peer reviews
Inter group coordination
Quantitative Project management
S/W product engineering
Integrated software management
S/W Quality management
Defect prevention
Technology change mgmt
Proces change mgmt

Is This Answer Correct ?    0 Yes 0 No

what is cmmlevel each and everystage i want to complete details please any one mail me i want to c..

Answer / satyaprasad

CMM(compactability maturity module),it has Five levels
initial- Level 1
repeated- Level 2
Defined - Level 3
Managed - Level 4
Optimized- Level 5

Is This Answer Correct ?    0 Yes 0 No

what is cmmlevel each and everystage i want to complete details please any one mail me i want to c..

Answer / sai

It is a compactability meturity model,It shows the company
standards

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Manual Testing Interview Questions

What is neutral test case?

0 Answers  


I don't know about testing, I want to learn about Teasting. What kind of books I should read? Can anyone help me? (Like manual, automated testing) lots of things are there. from where I should start?

2 Answers  


what is entry / exit criteria and pass / fail criteria ?

1 Answers  


1. What are your overall impressions of the Web site?

0 Answers  


why do u put the bug status as deffered?what do u mean by that exactly?

5 Answers   Wipro,






Beyond the customary advantages of having a testing group, what are the benefits does a company receive from a well run, automated testing group?

0 Answers   TCS,


suppose u got defects.we r send to this through TD.Before that where we r stored

2 Answers   Exalt,


When to start and Stop Testing?

7 Answers  


what is spiral model?

1 Answers  


How do we find pass and fail percentage of Test cases. Anybody can give answer to me. Thanks in advance

2 Answers   HCL, Satyam,


hi,I want to learn testing concepts. But, actually, at least, I don't have basic knowledge about testing. but, my desire is to learn testing concepts. But, I don't know, which material is good?And which site is good to learn testing concepts. Please, could any one help me regarding this? If any one have good material with you, with out feel, kindly forward that material to me? Please, do this help for me. Thanks in Advance. my mail id is gopimanchella@gmail.com BEST REGARDS M.MurthySharma.

7 Answers  


What is System Testing Phase? Which types of testing will be conducted in system testing phase?

1 Answers  


Categories