What is early delta initialization?
Answers were Sorted based on User's Feedback
Answer / sreenu
HI
i don't think so , it will take system down time, so what is
the need of doing that..
With early delta initialization, you have the option of
writing the data into the delta queue or into the delta
tables for the application during the initialization request
in the source system. This means that you are able to
execute the initialization of the delta process (the init
request), without having to stop the posting of data in the
source system. The option of executing an early delta
initialization is only available if the DataSource extractor
called in the source system with this data request supports
this.
Extractors that support early delta initialization are
delivered with Plug-Ins as of Plug-In (-A) 2002.1.
You cannot run an initialization simulation together with an
early delta initialization.
Is This Answer Correct ? | 9 Yes | 3 No |
Answer / annobw
This is the process in which you run the init of delta and
load the delta queue in parallel: the LO extraction
supports this this allows minimum downtime on the R/3 side
Is This Answer Correct ? | 4 Yes | 2 No |
Where do we use write optimized dso?
Can you create a data storage area in the sap bw?
What exactly do you know about business warehouse statistics?
What is I_step1,I_step2,I_step3 in customer exit
What are the variable processing types?
What are the do?s and don?ts?
Define an info source?
What are the steps to create a generic data source?
I have a process chain is running the infopackage get error don't process the error of that info package and then you can run the dependent variants is it possible?
Explain about ods?
What is characteristics derivation?
What is virtual info cube with services?