AFTER CREATING THE SALES ORDER WE NEED TO DELIVERY THE
PRODUCT. WHEN U CREATING THE DELIVERY , THE SYSTEM SHOWS
LIKE " NO ZERO EA MATERIAL <XX> AVAILABLE" . HOW TO RECTIFY?
Answers were Sorted based on User's Feedback
Answer / subha
This error comes on account of the materila not being
allocted for delivery and the is the porblem with schdule line
Frist view the stock is there in the palnt or or trhorugh
mmbe if not them need tpo post the stock in the palnt
through MB1C
Once posted check if on the delivery date in the schdule
lines in with respect to date and avilability of the
materila nad there should be not delivriy block
Once these 2 steeign are made you will be able to create
trhe delivery with out any issue
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / nandkumar
Before delivery first you have to check Wheather the stock
available for the material in that plant,storage
location,batch or not?
If not then put a stock through MB1C Transaction.
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / v.s.krishnan
this can be done thru backorder processing v_ra go to stock
posting mb1c enter the material then save.check the
avalability check in mmo2 in general plant data make it
2.then go to the tcode v_ra give the data and updateit.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / vikash mishra
Go to Tcode-OVLP..select the item category you r using,go inside and activate the check box mat.no.'0'allowed..
This should solve your problem..
Is This Answer Correct ? | 1 Yes | 2 No |
Answer / dinesh bisht
Materila must be available in plant for relevant delivey.
In this scenario we have two option.
1)Post some material to the plant.
2)Transfer materila from other plant if it is not available
at current plant.
Thanks
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / syamantak
First of all we need to post stock into the plant for the
material using T_code mb1c; then only it will allow you to
Post Goods Issue the material in the delivery document for
the material
Is This Answer Correct ? | 2 Yes | 5 No |
Do you have schedule lines in the delivery?
What is a one time customer?
Can you partially settle rebate accruals?
What do you mean by user specific parameters?
how to add transit time to invoice date? if it is through user exit, which user exit will you use in sap SD?
What are the different activities under consignment stock in sap sd?
Please send me some solved Tickets(SD),I have an Interview within few days(maybe low, medium priority).
Differnce between Trade customer and non trade customer?
What is the difference between milestone and periodic billing???
how to maintain number ranges in excise invoice ?
I have a scenario where the our unit of measure is Pc. The conversion is 1pc = 2.9768 m2. Now the client is saying that he will give the prices in Cubic meter. The current requiment is we have to derive a conversion ratio between pc (m2) and cbm. Please advice.
What is the difference between STATIC CREDIT and DYNAMIC credit