How to configure the integration of pp and pm, where it is being done in spro, what are the pre-requisite and what are the steps?
No Answer is Posted For this Question
Be the First to Post Answer
Is it possible to assign user status to a sub-operation in maintenance order?
If I want to change the planning plant for the task list, how should I proceed?
What are various possible settlement receivers in a maintenance order?
Differentiate between control keys pm02 and pm03.
What level of functional locations should be changed for alternative labelling?
What is equipment master record?
How does actual cost of maintenance come on maintenance order?
What is call horizon? Explain with example.
list the standard mis reports available in pm.
Differentiate between equipment master and material master. On what basis do we decide which one should we create?
What are the different reports under plant maintenance in information system?
Is it possible to change the structure indicator of functional location?