What are the lot size you have used?
Answer / irimi
1- Lot by lot
2- Exact quantity
3- Replenishment to the maximum
Is This Answer Correct ? | 0 Yes | 0 No |
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
How do you get the system to update this value from the routing?
What is planned consumption and unplanned consumption?
In which context do you use bills of material? [ ] Material Requirements Planning [ ] Execute Production [ ] Goods Movements (to Help Data Entry) [ ] Product Costing [ ] Development/Engineering/Design [ ] Documentation [ ] Others
can any body tell me integration between pp with fi,mm,sd.
How did you configure the payscale structure?
Which MRP types you have used?
Explain what happens to plan after it has been converted into production order?
What is the difference between stock transport order and stock transfer order?
What are different MRP types?
Explain the gaps and the steps involved in them.
What r different reduction startergies in SAP PP?