Sales order is created 1st November for 200 tooth pastes 100 brushes free of goods(2 1 free goods).At the time of delivery on 15th
November you have shortage of brushes by 40. offer closed on 15th November . How do you solve in this scenario?
It depends on the company how they r practising
1 . Take the permissin from the customer and from the respective head in your company and extend the validity of the free goods for the customer and material in VBN2 for the next availability of that material.Bill the same when you procure or production of the material .
2. You can bill as per the sales order and take the permission from the customer for the rest of the brushes for later delivery . Though its not systematic . first customer should agree to this and next we have to take care how to send the rest of the brushes to customer bcz there will be no proper invoice because you have already raised it , you have to send it through manual billing with zero value for that you should be having sales tax people's permission.
3 . You can procure the rest of the brushes from the external vendor and deliver it to the customer on the same day or with permission of customer on someother day.If the material can be procured on the same day you can invoice the customer on november 15th itself.Else you have to take the permission from the customer for the delivery of brushes left on someother day .
4 . You can go for the production of the brushes. Lets say it takes 7 days to produce it . You can send the available material to customer on 15th november with proforma invoice and rest with after 7 days with someother order with manual billing and same can be accounted in the system with proper PGI and invoice.But the sale will get counted for november 22nd.Else if period is open you can do back dated PGI and invoicing .
Is This Answer Correct ? | 8 Yes | 2 No |
What do you do really in pricing determination, and what are the main differences between one pricing procedure determination to the others, which data control these differences?
client wants to have sales of particular material area wise. How to write functional spec for this
What are the requirement you have gathered from your client and what type of business process your client had?
I have a difficulty in PGI.Whenever we do PGI,theerrors occured that posting between these periods are not possible.How i will overcome from that problem?
What are the test plans you have prepared? What are the configuration documents you have prepared? What is your test strategy? What are the requirements you have in Functional testing?
I dont want to take print out as a output type while creating a sales order, instead i want to send it as a IDOC. what customization i have to do?
What is the transaction code for creating a material in sap and what is the transaction code to extend a material?
what is document flow? and in which table document flow data wil be store? its a recently asked question from wipro technologies. so pls guide me in detail
A customer wants to ship goods to one party, bill to one party and collect payment from another party. How to configure it in sap?
I have a scenario where the our unit of measure is Pc. The conversion is 1pc = 2.9768 m2. Now the client is saying that he will give the prices in Cubic meter. The current requiment is we have to derive a conversion ratio between pc (m2) and cbm. Please advice.
On which server End user training are given?
i have run the tcode v.21 to get the billing log run report.but its not updating on one particuler date i.e 5 aug.so any one cn pls confirm me where i cn check y report has not get update on that date.