How many levels of Flexible Planning are there?
No Answer is Posted For this Question
Be the First to Post Answer
Can we create production order without bom and routing ?
What is special procurement & tell one special procurement briefly
Mention what are the keyfields found in mrp view 1?
Explain the process of Material costing.
Do you have products with a large number of variants? Do you need Variant Configuration?
What is the purpose of Catalog? how you reverse UD?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
What are the lot size you have used?
Difference between byproduct and co-product.
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
What is the planning horizon?
What is MPS and difference between MRP and MPS?