hi experts, i want my system to determine plant in to sales
order from material master though i maintain it in CMIR AND
CUSTOMER MASTER, where is the control?? faced in one of the
interviews..
Answers were Sorted based on User's Feedback
Answer / tej
if you uncheck readinfo record in vov8 plant will not
determined from cmir.
Is This Answer Correct ? | 12 Yes | 0 No |
Answer / sai
you can find it in mm01- sales org 1 tab as delivering plant
Is This Answer Correct ? | 0 Yes | 6 No |
what is the benefits of combine division
What is the difference between a sales activity and a sales document?
3. Whether Free goods should be determined or not for a Sales Order?
IN CONSIGNMENT SALES(CF) WHAT IS THE STOCK STATUS IN PLANT ? WHAT CONTROLS THE STOCK IN CONSIGNMENT SALES ?
Mandatory condition type MWST in Sales BOM LUMF
What is alternative formule for calculation type and alternative formula for condition baes value with example?
In sales order what fields are mandatory????
in one sales order there are two material can maintain two different pricing procedure for these materials?
how we will configure export sales in sd (respect to plants assign and sales process)?
what is the difference between bans and banc
Explain the userexits any two?
Can We change the account group of customer master?