Can any deviation be changed into the change control?
Answer / sumit tyagi
Any deviation can be convert in change control.
.if any deviated procedure have demands any changes after impact evaluation then deviation convert into change control
| Is This Answer Correct ? | 18 Yes | 0 No |
Why disintegration of uncoated tablets is 15 minutes why not 16 or 14 or any other value .
What is the process validation?
How to check the integrity of Sieve, Screen, FBD Bag?
Can we quantify bound water by KF titrator ?
How would you propose to advertise your drug?
What is the difference between Analytical method validation and Analytical method transfer?
What is the difference of vacuum pressure and vapor pressure?
what is difference between temporary change control and deviation
i am from orissa .can you please send me the question papers of drug inspector exam of orissa ?my email id is dynamicashu@gmail.com.i've completed my b.pharma can i apply for d.i exam ?
how to convert potency from on anhydrous basis to on dried basis?
If calibration of 12 bowl dissolution apparatus does not meets single stage procedure, how can you precede calibration?
what are the limit of LOD and LOQ