what is lead time, planning time, planning fence time ?
Answers were Sorted based on User's Feedback
Answer / varadhan
Lead time is the time taken to finish the entire process .
planning time fence is specifies the a period within that
no automatic changes are made to tne master plan
Is This Answer Correct ? | 28 Yes | 4 No |
Answer / girish pawar
Lead Time :: It is the total time required, by which
product is ready for use (manufacturing time +inspection +
handling.. etc)
Planning Time Fence: It is the time horizon which can
restrict the application area of the MRP. that is , there
will not be automatic changes to the Dates and quantities
within this Planning time fence ,during planning run.
It starts from current date to the number of days in future
specified as planning time fence as in work days .
Example >>> suppose , today is 13 January, and your
planning time fence is 5 days , then there will not be any
automatic changes during planning run between
13 Jan-to 18 January. And one day before the planning time
fence , that is on 17 january in our example ,the planned
orders are automatically get confirmed .
Is This Answer Correct ? | 13 Yes | 0 No |
Answer / prabhu
Lead Time:Total time required to complete the process which
is defined in Routing for manufacturing items.
Planning Time Fence:is the time horizon where no automatic
changes takes place,during planning run
Is This Answer Correct ? | 3 Yes | 0 No |
lead time is the time for the processing of the total
operation .it is the sum of the setup time,processing time
and tear down time. it is the actual operating time
planning time fence is the time period for which the prod,.
planning cant be disturbed
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / vijay
lead time is taken from routing
planning time fence is with in that no automatic changes are made in the planning file.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / friendhp
planning time may require to see backward in-house
production item/ GR Processing Time good receipt IPQC-QA
time), production time(queue, setup, procecss, move, wait),
and planed order convert to work order (opening period).
Is This Answer Correct ? | 6 Yes | 10 No |
Hi, I have run the standard cost estimate for one product. Can any one tell me the planning steps for 100 products. Sravan
What happens to planned after it has been converted into production order ?
Sir, i am BE mech qualified & around 9 years exp in industrial line especially production.Now i am looking for change to SAP PP.Is it too delay to switch over. I am waiting for valid answer from all.Pl do the needful & email to my email id arulgold03@yahoo.com
Mention what are the t-codes for creating, changing and summarizing bom?
Difference between Manual reorder point and Automatic reorder point.
What is prt (production resource tools) in sap pp?
What is a 'product hierarchy'?
How system calculate the actual cost?
Define mrp group
How many standard value keys can you mention at work center
What is alternative bom
How is the processing time calculated in a wc when both labor, machine categories exist?