when we create a sales order system should pick up route
schedule but system not picked up. i have done all settings
like scheduling with route schedule by shipping point, sales
doc type and delivery type. maintained the unloading point
and goods receiving hours in CMR and created route schedule
master data. can anyone explain this process?
Answer / rajiv trivedi
Please check whether you have assigned in Customer Master.
I think that you are missing.
Is This Answer Correct ? | 1 Yes | 0 No |
Can you share master data between several sales areas?
At what places availability check performed? is it done at invoice level also ? if yes what are the scenarios to perform availability check at invoice level? what are the settings to be done to perform to check at invoice level?
What is the break down in Pricing and Billing?
How can we process out bound deliveries without shipping point?
Explain to me in detail Alternate condition base value, and alternate calculation type?
Tax jurisdiction processing is a close link between which two modules?
Can you deference between contract & scheduling agreement?
I am having 2.1 yrs of experience in sap sd.can any one send me a sample of perfect resume to my mailid. vvnanda700@gmail.com
we have already using static credit check, but for a particular customer we want dynamic credit check from next month how to do this (for one customer only )since it s only for one customer we need to do in master data only, should not go for configuration settings. please provide possible solutions
How to do customization of rebate processing in sap sd????
What are the control parameters for automatic availability check during sales order? In sales order every time i have to click on check availability tab manually but i want it to trigger it automatically, how to do this?
What Time Neede to Upload Master Data and Trasaction Dat From Non SAP Systum to SAP Sys. through LSMW Tool ?