which is the best institute for testing in hyd?
Answers were Sorted based on User's Feedback
Answer / sowmay
hi this is sowmya
best institute for testing tools is suresh reddy smart
soultion is Best.
I completed my cource in this institute only and thety
provide gudiline also.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / santhi
hi
i am chandrika santhi .i completed testing tools cource in
suresh reddy smart soultion.
this is good institute for testing tools .now i am working
in value labs
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / bharat
Hi friends
best for software Testing tools is suresh reddy's smart
soultion is the best.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sowmya
hi this is sowmya
best institute for testing tools is suresh reddy smart
soultion is Best.
I completed my cource in this institute only and thety
provide gudiline also.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / thiru
hi this is THIRU MOOLINTI
best institute for testing tools is NARESH INSTITUTE (LOW
COST & BEST TEACHING)
| Is This Answer Correct ? | 0 Yes | 0 No |
What version of the oracle are you familiar with?
what are the main bugs which were identified by you and in that how many are considered as real bugs?
'This life cycle model is driven by schedule and budget risks' this statement is best suited for.
Explain cause effect graph?
what is the most challenging situvation r u phased while during testing?
What is Recovery Scenario
WHAT ARE THE BUG TRACKING TOOLS USED IN TESTING PROCESS AND WHICH IS BETTER TOOL TO BE USED IN BUG REPORTING ?
I need to learn who the major stakeholders are in each of the 7 stages of the SDLC. What is the best online resource?
What is user documentation?
IF i have two columns in Database , While using Database output value ,allthe values in the two column are set as a single row in the QTP datatable, can u suggest me a idea so that QTP Runtime datatable displays the values as it is in the database
Identification, control, auditing, and status accounting are functions of which one of the following? 1. Configuration management 2. Quality assurance 3. Verification and validation 4. Testing 5. Inspection
If 12=4, 22=10, 32=21 then 42=__?
10 Answers EA Electronic Arts,