Is it possible with 2 quotations one sales order
Answers were Sorted based on User's Feedback
Answer / arun
Yes, as long as these quotations are open and the Sales
area and shipping point are the same. Sometimes there is a
chance of automatic delivery split.
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / anupam
YES IT IS VERY MUCH POSSIBLE. COPY THE QUOTATIONS THROUGH
ITEM SELECTION OPTION AND COMBINE THE QUOTATIONS IN ONE
ORDER.
Is This Answer Correct ? | 5 Yes | 2 No |
Yes ! you can do this.Before combining 2 quotations in one sales order,you have to be confirmed that shipping point,sales area should be same.and after that please go to tcode VA26,here please give "quotation type" and "valid to" date.Then,you can see open quotation.select 2 quotation and click "Follow-up actions" buttion and save it.So,2 quotations create one sales order.
"if am I wrong,please give me correct answer"
Is This Answer Correct ? | 4 Yes | 2 No |
Hi Experts, The sales order is raised for 4 items and these items will be having the payment terms i,e for 30 days the company gives 2 % discount but i want to increase the credit validity period of that particular 4 th line item only for 45 days i,e the grace period for that particular line item will be incresed to 45 days with same 2% discount ,can any one suggest me how could it can be done. Thank q
What happens when a value is not entered for a manual and mandatory condition type and does a header condition type have an access sequence?
A customer wants to do purchases whole the week and wants to be billed once in a week for all his purchases during that week. How to do it / configure it in sap?
Outline the process flow for sales returns.
Is it possible to perform an availability check based on the plant yet exclude one storage location?
What is the difference between customization and configuration?
Recently in an Interview I have faced a question that "In SAP-SD, what is the Landscape of your project? Please help me, thanks in advance.
where do u integrate quality module with sd module
in varient configuration i have done all the configuration, created class,char,and dependencies,and assignments,then i created condition record va00 and pr00, but in sales order i am not getting the price result only i m getting material price..give me what are conf, i m missing....thanks in adavance
What is Sale order processing? Once sale order is created, the processing of S.O means, checking for the materiaal availability using Availability check,shiiping point determination, price determintaion, Back Order processsing, credit check holds removal, but will avaailability check include planned receipts, if planned receipts like prodn order will be considered in Avilability check which is done as Sale order processing, then does it mean that MRP needs to be run for availability check, coz MRP run gives u the qty to be produced and when it needs to be produced. Please clarify.
What are functional specs? can anyone give a eg. of a functional specification pls.
What is the difference between task and change request?