If I have one PO with me & I made GR with partial Qty &
after that I want to block PO for one month means user
shouldn't make GR against this PO & after one system should
allow to make GR. In this case where I need to do changes?
Answers were Sorted based on User's Feedback
Answer / subbu
Hi
We may select Block option agianst each item in PO (We will
have block (means lock) icon besides delete icon below Item
overview details).
If we select this icon, though user tried to post GR
against that PO line item,system issues error.
When ever user want to post GR against that PO line
items,then need to unblock (Unlock icon below item overview)
them and post.
Hope it works.
Regards
Subbu
Is This Answer Correct ? | 15 Yes | 0 No |
If you need block the PO for a planned period
You can block the PO through Purchase Order
Change Mode ME22N; Go to Purchase Order
Select line item, & block the line item with PO & save the
doc, whenever you need to unblock The Purchase Order line
item you can unblock by PO Change
By ME22N, you cannot prepare the GR if line item blocked
with PO.
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / dgdfhf
Open the Purchase Order:
Transaction Code: ME23N (Display Purchase Order) or ME22N (Change Purchase Order).
Navigate to the Delivery Tab:
Go to the "Delivery" tab in the Purchase Order screen.
Set the Delivery Completed Indicator:
In the "Delivery" tab, you will find the "Delivery Completed" field. Set this field to 'X' (checked) to block further Goods Receipt for the PO.
Save the Purchase Order:
Save the changes to the Purchase Order.
Monitor the Status:
Check the status of the Purchase Order to ensure that the "Delivery Completed" indicator is set.
Release the Block After One Month:
After one month, you will need to go back to the Purchase Order and unset the "Delivery Completed" indicator to allow Goods Receipt.
Open the Purchase Order:
Transaction Code: ME22N (Change Purchase Order).
Navigate to the Delivery Tab:
Go to the "Delivery" tab in the Purchase Order screen.
Unset the Delivery Completed Indicator:
Unset the "Delivery Completed" field (remove the 'X').
Save the Purchase Order:
Save the changes to the Purchase Order.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / murali
Also can be done in other way is to select line item and ensure delivery date is same as last consignment date.. thereby if any user is trying to make GR then system will not allow them to post. in future if required to take material then extend the delivery date for future date.
Is This Answer Correct ? | 1 Yes | 2 No |
Check "Delivery Completed" Indicator In this case along with putting tick on "Delivery Completed" Indicator, you should also block the line item in ME22N for further GRN.
Also one more way you can adopt is of changing the quantity in the PO, In your case changing to 10, but by doing this in future you will not be able to analyze what went wrong with this PO.
Is This Answer Correct ? | 0 Yes | 1 No |
Can I include the parameters like cost centre,plant.account assignmnet category,purchasing group in PR release strategy with classification which is at header level????
How do you plan for a vendor rating system and move about?
What is the purpose of gr/ir account while posting good receipt and invoice verification?
What are the types of tables in SAP?
What is mrp (material requirement planning)?
What is the class type? How will you configure a class type?
with in how many days we can complete the preparation of sap mm course for that how many hours should be prepared to complete the preparation as soon as possible & could u help out me to get the grip on the important topics
What is purpose of purchase value key in material master?
If you want to make item ok check boix as default then what will you do?
Explain vendor return procedure and its mapping in sap?
where you maintain in material master the multiple units of measures??
What is the difference between the stock transfer between, two plants belonging to same company code and those belonging to different company code?