Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Electrical Engineering Interview Questions
Questions Answers Views Company eMail

Why we need to carry out knee point voltage test of current transformer ?

Power Grid,

1 7443

wat s the electronic device used in the fan regulators recently?

2 5607

WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF Govt Polytechnic in deee 2nd year papers

2746

sir What is the different bet'n "Active & passive" sensors

Kirloskar,

3 6858

Sir Power transformer :- (in generating station) Alternator terminals side - Delta HT transmission line side - Star Why?

Kirloskar,

4 7833

sir, What is the purpose in Generating power plant is operated Lagging PF and Above 0.9 lag PF?

3 5891

in 220/132 substation in place of PT what equipment used & what r the role of that equipment

2 5186

what is resticted earth fault protection ? how did it protect & work in power transformer

3 5900

can we identify the direction of power flow in transmission line by after only looking the tower

TNEB Tamil Nadu Electricity Board,

7 20009

what is Distance protection & how did it work

2 5430

in 5 mva transformer 33/11 kv s/s what rating of capacitor bank is required & what is the fourmula for rating

6 15619

Difference between EDO and MDO breakers?

ACB,

10 69001

CBCT selection

2284

what is the knee point voltage in current transformer

2 5656

As the one point of eac phase winding is connected to each other in satr connction. Even if that at distribution side collesion of two diff phases result in to blast. Why?

1 3422


Post New Electrical Engineering Questions

Un-Answered Questions { Electrical Engineering }

What are the significant parts of dc generator?

1145


what is the standard values(Megger test) of resistances between L&N,L&E and N&E for a system on IEE regulations?

2269


What are the essential characteristics of signal flow graphs?

1109


Which types of gate insttaled in static switch. Please give me answer.

1627


In what cases (circumstances)we should apply P controller, PD controller, PI controller & PID controller ?

2185


What is meant by full pitched winding?

1185


WHAT IS LOAD CELL

2156


how many electricity poles are there and what are the names and their sizes.

1924


what are the advantages and disadvantages of speed control of 3 phase induction motor by varying frequency explain with drawing

2674


my diploma certificate in my higher education college

1616


What is the cut-off rate?

1164


What technology is used in latest generators?

2097


how to store the thunder power?

4498


We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible

1987


Hoe do calculate the Cable size for Amps rating ?

2166