In transmission line the line power loss only accured at resistance the inductance and capacitance wont consume power is it correct?
2 4613sir, why alternator output is connected to delta side in to generating transformer? any reasion?
3 7543sir, Two different rating of generator going to connect parallel, can it set same DROOP or different. Why? Please explain
2 7087generally in LT and MV motors we are using 3.5Coresx16,25,35,50 etc cable for supply.although motors is earthed at two point and having all protection.then why we are using that 1/2 core for earthing the motors.while in HT cable we are using only 3core cable for motor supply.generally lt and mv motors are delta connected and ht motors having star connection.whethere it is having any relation with winding connection( star or delta).all motors i am talking about are dol only.can anybody solve my confusion.thanks...
1931whatis the test procedure for lightning arrester which was installed one year back. i want check it whether it is working or not.
1 4252Post New Electrical Engineering Questions
Define settling time.
dg earth connect only in the amf panel or not why
Is it good to short Neutral and Ground in the PLC or DCS main Power supply. Pls give YES or NO with reasons...? Simarpreet
I am applying for NTPC examination.Can we please provide previous paper to my mail prasad.chintala108340@gmail.com
What is gross error?
No load tap changing transformer working
What is systematic error?
If a shunt Dynamo has induced emf 100V and 0.4 ohm resistance and battery of accumulator of open circuit emf 110V and 0.5 Ohm resistance are in parallel what is common terminal potential difference?
which are the criterias needed to select the kind of neutral earthing(solid earthing,resistance earthing,etc.) at various voltage levels in electrical distribution?
testing of Vector Group – YNaoD II
difference between servo motor and synchronous motor
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
What facility we get after CT secondary earthing and how?
What is meant by Im=30mA@Vk/2. How to know the kee point voltage for CT design
what kind of quetions will ask in BHEL in interview? Plz help me?