37.18kg/qu.cm.Compressive Strength and 10.20% Water Absorption weight,Efflorescence-nil this result use in construction work
1 585220 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
2733A lorry contains 3-Units of material(Sand/Metal/Gravel...) so 3-Units means how many (CFT and M3)
2 9412Post New Civil Engineering Questions
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
What is different between DI Pipe and CI pipe?
What is difference between limit state and working stress method? How it is applies in building structure.
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.
What is rate of concrete surface rendering work per sqm
What is the Hardness of M-40 grade concrete, general and theoratical
What type of tensile strength is handling by crank in beam? Thanks.
how to calculate the chair reinforcement length in slabs, footing or anywhere??
How many cum of 9.5mm stone in 1 ton ?
How much cum. Brick work can do by 1 madon
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)